Wensleydale Railway - Photo Archive


February 2016
Photographs
This month we have:-
1. The Rolling Stock Group repairing a carriage in the "polytunnel" at Leeming Bar
2. The Direct Works Team working at Scruton Station
3. The Direct Works Team placing fencing around the Fort bridge sections at Redmire
4. The Vegetation Team at work
5. The Leyburn Infrastructure Team doing work at Harmby and Leyburn

Ref - 547
Photo - Peter Collins
Preparing for welding, the outside of Mark 1 BSK (Brake Standard Corridor Coach) 35193 in the Polytunnel at Leeming Bar (23/02/2016)
Click here to see higher resolution photo
Ref - 547
Photo - Peter Collins
Preparing for welding, the outside of Mark 1 BSK (Brake Standard Corridor Coach) 35193 in the Polytunnel at Leeming Bar (23/02/2016)
Click here to see higher resolution photo
Ref - 548
Photo - John Tong
This shows David Dalton busy with the front wall of the Scruton platform extension; notice the gradient (edge) increase from Phase 1 (east end) to the expected Phase 3 (10/02/2016)
Click here to see higher resolution photo
Ref - 549
Photo - John Tong
This shows the beginning of the building of the West end wall of Phase 2 (10/02/2016)
Click here to see higher resolution photo
Ref - 550
Photo - John Tong
Work continued on the 2nd phase of Scruton platform extension with more bricks being laid; the slope increasing the height can clearly be seen (18/02/2016)
Click here to see higher resolution photo
Ref - 551
Photo - John Tong
Work continued on the 2nd phase of Scruton platform extension with more bricks being laid; the slope increasing the height can clearly be seen (18/02/2016)
Click here to see higher resolution photo
Ref - 552
Photo - John Tong
Washing out the cement mixer - a necessary task at the end of the day (18/02/2016)
Click here to see higher resolution photo
Ref - 553
Photo - John Tong
A dead ash tree needed to be felled adjacent to the Scruton platform extension (20/02/2016)
Click here to see higher resolution photo
Ref - 554
Photo - John Tong
The dead ash tree is now down at Scruton (20/02/2016)
Click here to see higher resolution photo
Ref - 555
Photo - John Tong
Clearing the brash from the felled dead ash tree at Scruton (20/02/2016)
Click here to see higher resolution photo
Ref - 556
Photo - John Tong
The felled ash tree has now been cleared - only sawdust remains (20/02/2016)
Click here to see higher resolution photo
Ref - 557
Photo - David Dalton
The 'Arrowhead' metal brackets being removed on the Scruton west level crossing gate for repainting. (24/02/2016)
Click here to see higher resolution photo
Ref - 558
Photo - David Dalton
Calking/Sealant applied to the anti-trespass bars on Scruton west level crossing gate (24/02/2016)
Click here to see higher resolution photo
Ref - 559
Photo - David Dalton
A large Hawthorn multi-stem trunk that needs to be removed at Scruton (24/02/2016)
Click here to see higher resolution photo
Ref - 560
Photo - David Dalton
The large Hawthorn trunk being dug out (24/02/2016)
Click here to see higher resolution photo
Ref - 561
Photo - David Dalton
The Hawthorn trunk now dug out on the boundary at Scruton Station (24/02/2016)
Click here to see higher resolution photo
Ref - 562
Photo - David Dalton
The Phase 2 brickwork at Scruton Station - The slope is looking good (24/02/2016)
Click here to see higher resolution photo
Ref - 563
Photo - David Dalton
Work has started on Wash House at the rear of Scruton Station (24/02/2016)
Click here to see higher resolution photo
Ref - 564
Photo - Derek Bailey
The new Wash House at Scruton Station now has a door frame (24/02/2016)
Click here to see higher resolution photo
Ref - 565
Photo - Derek Bailey
Preparing to fit a roof at the new Wash House at Scruton Station (24/02/2016)
Click here to see higher resolution photo
Ref - 566
Photo - Derek Bailey
Roof supports now installed for the new Wash House at Scruton Station (24/02/2016)
Click here to see higher resolution photo
Ref - 567
Photo - Derek Bailey
Another view showing the roof supports now installed for the new Wash House at Scruton Station (24/02/2016)
Click here to see higher resolution photo
Ref - 568
Photo - Derek Bailey
The Direct Works Team also went to Redmire - here is a view with a light covering of snow (24/02/2016)
Click here to see higher resolution photo
Ref - 569
Photo - Derek Bailey
Lots of Heres fencing had to be erected at Redmire to protect the 2 Fort Bridge Sections from trespassers injuring themselves!
Fence sections being unloaded and erected (24/02/2016)Click here to see higher resolution photo
Ref - 570
Photo - Derek Bailey
Lots of Heres fencing had to be erected at Redmire to protect the 2 Fort Bridge Sections from trespassers injuring themselves!
Fence sections being erected (24/02/2016)Click here to see higher resolution photo
Ref - 571
Photo - Steve Hall
The Vegetation Team clearing a drainage channel near Newton Grange (03/02/2016)
Click here to see higher resolution photo
Ref - 572
Photo - Steve Hall
The Vegetation Team clearing a drainage channel near Newton Grange (03/02/2016)
Click here to see higher resolution photo
Ref - 573
Photo - Steve Hall
The Vegetation Team working on a drainage channel near Newton Grange (03/02/2016)
Click here to see higher resolution photo
Ref - 574
Photo - Steve Hall
The Vegetation Team busy clearing the embankment of vegetation near Newton Grange (03/02/2016)
Click here to see higher resolution photo
Ref - 575
Photo - Steve Hall
Timothy Edwards of the Vegetation Team have a break from clearing the embankment of vegetation near Newton Grange (03/02/2016)
Click here to see higher resolution photo
Ref - 576
Photo - Steve Hall
The Vegetation Team were doing some work at Akebar - Here is a view of the embankment where the slip was a couple of years ago (24/02/2016)
Click here to see higher resolution photo
Ref - 577
Photo - Steve Hall
The Vegetation Team were doing some work at Akebar - Here is a view of the embankment from the other direction (24/02/2016)
Click here to see higher resolution photo
Ref - 578
Photo - Steve Hall
The Vegetation Team clearing vegetation from the cutting at Akebar (24/02/2016)
Click here to see higher resolution photo
Ref - 579
Photo - Steve Hall
The Vegetation Team clearing vegetation from the cutting at Akebar (24/02/2016)
Click here to see higher resolution photo
Ref - 580
Photo - Michael Metcalfe
Park Leisure's Pogo operated crossing at Harmby had some wood decking timbers replaced - shows a timber been lined up to be measured (18/02/2016)
Click here to see higher resolution photo
Ref - 581
Photo - Michael Metcalfe
Park Leisure's Pogo operated crossing at Harmby had some wood decking timbers replaced - the timber having cut out removed to allow it to sit around the rail chairs (18/02/2016)
Click here to see higher resolution photo
Ref - 582
Photo - Michael Metcalfe
The Leyburn Infrastructure Team cut the last of the trees down on the south side embankment between bridge 25 and bridge 26 at Leyburn (20/02/2016)
Click here to see higher resolution photo
Ref - 583
Photo - Michael Metcalfe
The Leyburn Infrastructure Team cut the last of the trees down on the south side embankment between bridge 25 and bridge 26 at Leyburn (20/02/2016)
Click here to see higher resolution photo
Ref - 584
Photo - Michael Metcalfe
This bank at Leyburn has not been this clear for nearly 10 years now. It also shows the brash stacked up ready for shredding or movement out of town to enable burning without annoying the local..! More work is needed on the north side and hopefully the Wednesday Veg gang will be back soon to carry on (23/02/2016)
Click here to see higher resolution photo
Ref - 585
Photo - Michael Metcalfe
Sometime in the 2 weeks prior to 24th February a contractor has installed a new high spec tubular handrail at B31 Preston Under Scar.!! (24/02/2016)
Click here to see higher resolution photo