Wensleydale Railway - Photo Archive


September 2016
Photographs
This month we have:-
1. Joem at Bedale and Redmire
2. The visit of the London and South East Branch of the WRA(T) to the railway
3. Work at Scruton Station
4. Work of the Leyburn Infrastructure Team
5. Work of the Vegetation Team
6. The finished track renewal at Northallerton West
7. An Open Day at Aysgarth Station site
-s.jpg)
Photo - David Muscroft
Joem entering Bedale Station (18/08/2016)
Click here to see higher resolution photo
Photo - David Muscroft
Joem entering Bedale Station (18/08/2016)
Click here to see higher resolution photo
Photo - David Muscroft
Joem approaching Redmire with a train (18/08/2016)
Click here to see higher resolution photo
Photo - David Muscroft
Joem at Redmire station (18/08/2016)
Click here to see higher resolution photo
Photo - David Muscroft
Joem running round its train at Redmire (18/08/2016)
Click here to see higher resolution photo
Photo - John Tong
The London and South East Branch of the WRA(T) visited Scruton Station (03/09/2016)
Click here to see higher resolution photo
Photo - John Tong
The London and South East Branch of the WRA(T) enjoying a ride on the train (03/09/2016)
Click here to see higher resolution photo
Photo - David Walker
The new timber service platform is complete apart from Tactiles yet to be fitted. Work has commenced on the ramp section that links the new service platform and the low level - heritage platform. The structure is impressive containing over 15 tonnes of timber and 2000 bolts and coach screws. The NER design of 1909 has been followed with detail modifications to meet current rail standards. This is an affordable construction method costing around £8k per coach length, having a service life of at least 40 years- at which point the decking may need renewal. (16/08/2016)
Click here to see higher resolution photo
Photo - David Walker
A general view of Scruton Station and level crossing (16/08/2016)
Click here to see higher resolution photo
Photo - John Tong
The front edge of Phase 2 of Scruton station platform now joins the old platform to the new wooden platform (03/09/2016)
Click here to see higher resolution photo
Photo - John Tong
The front edge of Phase 2 of Scruton station platform now joins the old platform to the new wooden platform (07/09/2016)
Click here to see higher resolution photo
Photo - John Tong
The foundations of the pig sty at the back of Scruton station under construction (14/09/2016)
Click here to see higher resolution photo
Photo - John Tong
The foundations of the pig sty at Scruton station are now complete (14/09/2016)
Click here to see higher resolution photo
Photo - Michael Metcalfe
Not me..! This is the state we found the gate at MHF 1 near Wensley Station during Leyburn's work party on 05-09-16. Despite some new wood which I presume the horses owner put up, the horse on the right (suspect) has been rubbing his rear end and broke it at a knot along with the rest of the gate. The gate was repaired enough to hopefully last a while till a new steel gate can be sourced. Well after a revisit on the next work party on 19-09-16 the gate is broken again so clearly a very destructive horse..! Alas this time no tools or wood with me to fix it this time..! (16/09/2016)
Click here to see higher resolution photo
Photo - Michael Metcalfe
The Leyburn Infrastructure team renewing sleepers between Wensley Crossing and bridge (16/09/2016)
Click here to see higher resolution photo
Photo - Steve Hall
The Vegetation Team working near Primrose farm crossing west of Newton le Willows (28/09/2016)
Click here to see higher resolution photo
Photo - Steve Hall
The Vegetation Team working near Primrose farm crossing west of Newton le Willows (28/09/2016)
Click here to see higher resolution photo
Photo - Andy Waite
The completed track renewal at Castle Hills, Northallerton (23/07/2016)
Click here to see higher resolution photo
Photo - Andy Waite
The completed track renewal at Castle Hills, Northallerton (03/08/2016)
Click here to see higher resolution photo
Photo - Andy Waite
The completed track renewal at Castle Hills, Northallerton (03/08/2016)
Click here to see higher resolution photo
Photo - Andy Glendinning
The waiting room at Aysgarth Station site illuminated at night during a recent private evening event in September (03/09/2016)
Click here to see higher resolution photo
Photo - Andy Glendinning
The signal box at Aysgarth Station site illuminated at night during a recent private evening event in September (03/09/2016)
Click here to see higher resolution photo
Photo - Timothy Edwards
The goods shed at Aysgarth Station site during a recent Open Day (29/08/2016)
Click here to see higher resolution photo
Photo - Timothy Edwards
The inside of the signal box at Aysgarth Station site during a recent Open Day (29/08/2016)
Click here to see higher resolution photo
Photo - Timothy Edwards
The signal box at Aysgarth Station site during a recent Open Day (29/08/2016)
Click here to see higher resolution photo
Photo - Timothy Edwards
The model railway of Aysgarth Station at the Aysgarth Station site during a recent Open Day (29/08/2016)
Click here to see higher resolution photo
Photo - Timothy Edwards
The model railway of Aysgarth Station at the Aysgarth Station site during a recent Open Day (29/08/2016)
Click here to see higher resolution photo
Photo - Timothy Edwards
The waiting room, signal box and platforms at Aysgarth Station site during a recent Open Day (29/08/2016)
Click here to see higher resolution photo
Photo - Timothy Edwards
Joem leaving Bedale Station (10/09/2016)
Click here to see higher resolution photo
Photo - Timothy Edwards
A service train leaving Bedale Station (10/09/2016)
Click here to see higher resolution photo
Tip - You may find it better to view the pictures in 'full screen' mode - For most browsers F11 will toggle this on and off
© 2021 Wensleydale Railway