Wensleydale Railway - Photo Archive


November 2016
Photographs
This month we have:-
1. A magical snowy scene at Aysgarth
2. A group from the Aln Valley Railway recently visited out railway
3. Scruton Station at Sunset
4. The Vegetation Team at work
5. The Direct Works Team working at Scruton Station
6. The Leyburn Infrastructure Team moving cleared vegetation by train
7. Installing of a battery backed power supply at Bedale signalbox

Ref - 1485
Photo - Richard Burton
A beautitful view of Aysgarth Station in the recent snow
Richard Burton was staying for a few days in the Aysgarth Station cottage at the time and had the pleasure of witnessing this magical scene. (09/11/2016)
Click here to see higher resolution photo
Ref - 1485
Photo - Richard Burton
A beautitful view of Aysgarth Station in the recent snow
Richard Burton was staying for a few days in the Aysgarth Station cottage at the time and had the pleasure of witnessing this magical scene. (09/11/2016)Click here to see higher resolution photo
Ref - 1486
Photo - Peter Collins
A group from the Aln Valley Railway recently visited out railway (--/11/2016)
Click here to see higher resolution photo
Ref - 1487
Photo - David Walker
Scruton Station at sunset - The gates are just in view, these have been shortlisted for a national railway award. We will learn the outcome in London on 7 December (23/11/2016)
Click here to see higher resolution photo
Ref - 1488
Photo - Steve Hall
Some of the kit that the Vegetation Team uses on their Wednesday work days (24/08/2016)
Click here to see higher resolution photo
Ref - 1489
Photo - Steve Hall
Vegetation awaiting clearance on Akebar Bank near Spruce Gill UWC
The disused signal post used to be the Finghall Lane Down Distant. (13/10/2016)Click here to see higher resolution photo
Ref - 1490
Photo - Steve Hall
The Vegetation Team working at Langthorne Woods in the snow (09/11/2016)
Click here to see higher resolution photo
Ref - 1492
Photo - Steve Hall
The Vegetation Team working at Langthorne Woods in the snow (09/11/2016)
Click here to see higher resolution photo
Ref - 1493
Photo - Steve Hall
The Vegetation Team working at Langthorne Woods in the snow (09/11/2016)
Click here to see higher resolution photo
Ref - 1495
Photo - Steve Hall
The Vegetation Team working at Langthorne Woods with the aid of a works train (23/11/2016)
Click here to see higher resolution photo
Ref - 1498
Photo - Steve Hall
The Vegetation Team working near Ham Hall level crossing (16/11/2016)
Click here to see higher resolution photo
Ref - 1499
Photo - John Tong
Drainage Gutter fitted against the platform extension at Scruton (02/11/2016)
Click here to see higher resolution photo
Ref - 1500
Photo - John Tong
End edging stone slabs fitted against wooden platform at Scruton (02/11/2016)
Click here to see higher resolution photo
Ref - 1501
Photo - John Tong
The Ramp edge with the Tactile Slabs fitted at Scruton (02/11/2016)
Click here to see higher resolution photo
Ref - 1502
Photo - John Tong
Whole Ramp ready for new surface at Scruton (02/11/2016)
Click here to see higher resolution photo
Ref - 1503
Photo - John Tong
Work starts on Washouse Roof and Water Pipe connection at the rear of Scruton Station (30/11/2016)
Click here to see higher resolution photo
Ref - 1505
Photo - John Tong
Direct Works Team Xmas Dinner at the Whistle Stop Cafe (30/11/2016)
Click here to see higher resolution photo
Ref - 1506
Photo - John Tong
Direct Works Team Xmas Dinner at the Whistle Stop Cafe (30/11/2016)
Click here to see higher resolution photo
Ref - 1507
Photo - Michael Metcalfe
37/674 Stands at the head of a works train with 5 Sea Urchins in between Bridges B25 & B26 in Leyburn
Due to a ban on lineside vegetation burning at this location two train loads of brash were removed westwards beyond bridge B29 for future burning. Unfortunately there is still more to be removed or disposed of..! (28/11/2016)Click here to see higher resolution photo
Ref - 1508
Photo - Michael Metcalfe
37/674 Stands at the head of a works train with 5 Sea Urchins in between Bridges B25 & B26 in Leyburn
Due to a ban on lineside vegetation burning at this location two train loads of brash were removed westwards beyond bridge B29 for future burning. Unfortunately there is still more to be removed or disposed of..! (28/11/2016)Click here to see higher resolution photo
Ref - 1509
Photo - Michael Metcalfe
Once all the vegetation was all loaded in at Leyburn and the train moved to the destination, it had to be thrown out again and this was not one of the easiest of jobs. (28/11/2016)
Click here to see higher resolution photo
Ref - 1510
Photo - Peter Harbord
Timothy Edwards installing the new battery charger for signalling supplies at Bedale signalbox (28/11/2016)
Click here to see higher resolution photo
Tip - You may find it better to view the pictures in 'full screen' mode - For most browsers F11 will toggle this on and off
date_default_timezone_set("Europe/London"); ?>© 2025 Wensleydale Railway