This month we have:-
1. The VIP first run of the High Class Afternoon Tea Train.
2. Various views of trains and locomotives on the line
3. The Northallerton Branch visit to the Hitachi Train Manufacturing Plant
4. The Direct Works Team at Scruton
5. Weedkilling on the line
6. The Leeming Bar and Leyburn Infrastructure Teams at work on various jobs
7. Installation of a new point at Leyburn East - the first stage of the proposed Leyburn passing loop. For more photos see here.

Ref - 2619
Photo - Richard Jemison
The 1913 built London and North Western Railway Directors’ Saloon Car set out for its high class Afternoon Tea Service (16/06/2017)
Click here to see higher resolution photo
Ref - 2619
Photo - Richard Jemison
The 1913 built London and North Western Railway Directors’ Saloon Car set out for its high class Afternoon Tea Service (16/06/2017)
Click here to see higher resolution photo
Ref - 2620
Photo - Richard Jemison
The new high class afternoon tea train service using the 1913 built London and North Western Railway Directors’ Saloon Car was launched by a group of VIPs - Here some of them are seen walking along Bedale platform (16/06/2017)
Click here to see higher resolution photo
Ref - 2621
Photo - Richard Jemison
The new high class afternoon tea train service using the 1913 built London and North Western Railway Directors’ Saloon Car was launched by a group of VIPs - Here is the local MP Rishi Sunak being welcomed to the coach on Bedale station platform (16/06/2017)
Click here to see higher resolution photo
Ref - 2622
Photo - Richard Jemison
The new high class afternoon tea train service using the 1913 built London and North Western Railway Directors’ Saloon Car was launched by a group of VIPs (16/06/2017)
Click here to see higher resolution photo
Ref - 2623
Photo - Richard Jemison
The new high class afternoon tea train service using the 1913 built London and North Western Railway Directors’ Saloon Car was launched by a group of VIPs - Richmondshire MP, Rishi Sunak, North Yorkshire County Council Leader, Cllr Carl Les, County Councillor Karin Sedgwick, Middle Dales division and Welcome to Yorkshire CEO Sir Gary Verity. (16/06/2017)
Click here to see higher resolution photo
Ref - 2624
Photo - Richard Jemison
The new high class afternoon tea train service using the 1913 built London and North Western Railway Directors’ Saloon Car was launched by a group of VIPs - Here the train is leaving Bedale with the LNWR saloon at the rear (16/06/2017)
Click here to see higher resolution photo
Ref - 2625
Photo - Andy Glendinning
The VIP launch train of the new Directors' Saloon tea service between Newton le Willows and Crakehall (16/06/2017)
Click here to see higher resolution photo
Ref - 2626
Photo - Timothy Edwards
47715 "Haymarket" hauling the afternoon tea train service over Bedale crossing (20/06/2017)
Click here to see higher resolution photo
Ref - 2627
Photo - Timothy Edwards
The LNWR Directors Saloon on an afternoon tea train arriving back at Bedale with 47714 "Haymarket" (20/06/2017)
Click here to see higher resolution photo
Ref - 2628
Photo - Andy Glendinning
A works train hauled by loco 20166 passes the Yorkshire Dales Caravan crossing (08/06/2017)
Click here to see higher resolution photo
Ref - 2629
Photo - David Hart
A group of Northallerton Branch Members on a visit to the Hitachi Train Manufacturing Plant at Newton Aycliffe (05/06/2017)
Click here to see higher resolution photo
Ref - 2630
Photo - Timothy Edwards
Some completed trains at the rear of the Hitachi Train Manufacturing Plant at Newton Aycliffe (05/06/2017)
Click here to see higher resolution photo
Ref - 2631
Photo - Andy Glendinning
A Salmon wagon at Redmire -- sleepers for Yafforth and equipment from the WensleyAle beer festival (30/05/2017)
Click here to see higher resolution photo
Ref - 2632
Photo - John Tong
The Direct Works Team extending the Back Fence at Scruton Station (24/05/2017)
Click here to see higher resolution photo
Ref - 2633
Photo - John Tong
The Direct Works Team cutting Fencing Panels at Scruton Station (24/05/2017)
Click here to see higher resolution photo
Ref - 2634
Photo - John Tong
The Direct Works Team working on the back gate at Scruton Station (24/05/2017)
Click here to see higher resolution photo
Ref - 2635
Photo - John Tong
The Direct Works Team working in the Back Garden at Scruton Station (14/06/2017)
Click here to see higher resolution photo
Ref - 2636
Photo - John Tong
The Direct Works Team putting slates on the Pig Sty Roof at Scruton Station (14/06/2017)
Click here to see higher resolution photo
Ref - 2637
Photo - John Tong
The Direct Works Team making steps for the back gate at Scruton Station (14/06/2017)
Click here to see higher resolution photo
Ref - 2638
Photo - John Tong
Watch this space - the future location of a back gate & steps to allow access to the space behind the new platform extension at Scruton Station (14/06/2017)
Click here to see higher resolution photo
Ref - 2639
Photo - Ian Yale
Steam locomotive power stabled at Leeming Bar (10/06/2017)
Click here to see higher resolution photo
Ref - 2640
Photo - Andy Glendinning
D9523 arriving at Leyburn on the 1350 Redmire-Leeming Bar (17/06/2017)
Click here to see higher resolution photo
Ref - 2641
Photo - Andy Glendinning
Passengers prepare to board the inaugural Directors' Saloon afternoon tea service at Bedale hauled by D9523 (17/06/2017)
Click here to see higher resolution photo
Ref - 2642
Photo - Andy Glendinning
The Leyburn Infrastructure Team replacing crossing signs between Leyburn and Wensley (12/06/2017)
Click here to see higher resolution photo
Ref - 2643
Photo - Andy Glendinning
The Weedkilling unit between Crakehall and Newton le Willows (13/06/2017)
Click here to see higher resolution photo
Ref - 2644
Photo - Ian Yale
The Infrastructure Team - before two rotten sleepers were replaced at Leeming Bar main running line (marked with an 'X') (10/06/2017)
Click here to see higher resolution photo
Ref - 2645
Photo - Ian Yale
The Infrastructure Team - showing how the sleepers structural integrity has deteriorated (10/06/2017)
Click here to see higher resolution photo
Ref - 2646
Photo - Alastair Connell
The Infrastructure Team - showing how the sleepers structural integrity has deteriorated (10/06/2017)
Click here to see higher resolution photo
Ref - 2647
Photo - Andy Waite
The Infrastructure Team - Before vegetation was cleared from the lineside just west of Finghall Lane (17/06/2017)
Click here to see higher resolution photo
Ref - 2648
Photo - Andy Waite
The infrastructure Team - After clearance of vegetation from the lineside just west of Finghall Lane (17/06/2017)
Click here to see higher resolution photo
Ref - 2649
Photo - Ian Yale
The Infrastructure Team - showing the length of rail moved by a combination of brute force, rollers, bars, hand winch and strops (10/06/2017)
Click here to see higher resolution photo
Ref - 2650
Photo - Ian Yale
The Infrastructure Team - showing the amount of rails required to be manually moved from between the sidings to near the running line in order for the road / rail grab to be able to lift them for transportation and installation at Leyburn later this month for the new point (10/06/2017)
Click here to see higher resolution photo
Ref - 2651
Photo - Alastair Connell
The Infrastructure Team - showing the amount of rails required to be manually moved from between the sidings to near the running line in order for the road / rail grab to be able to lift them for transportation and installation at Leyburn later this month for the new point (10/06/2017)
Click here to see higher resolution photo
Ref - 2652
Photo - Andy Glendinning
Concrete sleepers being dropped at Yafforth by a road rail grab (21/06/2017)
Click here to see higher resolution photo
Ref - 2653
Photo - Alastair Connell
The infrastructure Team - 50 of EG47 concrete sleepers offloaded at Yafforth for a future track renewal through the crossing. (21/06/2017)
Click here to see higher resolution photo
Ref - 2654
Photo - Alastair Connell
Recovery of scrap rail from the lineside using a hired in road-rail grab (21/06/2017)
Click here to see higher resolution photo
Ref - 2655
Photo - Alastair Connell
Recovery of scrap rail from the lineside using a hired in road-rail grab (21/06/2017)
Click here to see higher resolution photo
Ref - 2656
Photo - Alastair Connell
A load of scrap rail, mainly 90lb bullhead, cut-up and collected from around Leeming Bar station and between there and Aiskew LC, being loaded onto a lorry. This was exchanged for sleepers/timbers for the new points at Leyburn and 100 serviceable softwood sleepers. (21/06/2017)
Click here to see higher resolution photo
Ref - 2657
Photo - Alastair Connell
The infrastructure Team - Scrap rail being loaded onto a lorry at Bedale using a Road Rail Grab (22/06/2017)
Click here to see higher resolution photo
Ref - 2658
Photo - Andy Glendinning
Works train in Bedale siding with roadrailer preparing to erect buffer stops at the end of the siding (22/06/2017)
Click here to see higher resolution photo
Ref - 2659
Photo - Alastair Connell
The infrastructure Team - A new bufferstop installed at the west end of what is now Bedale Siding. The materials for this were again collected from around Leeming Bar yard, contributing to an ongoing site tidy. (22/06/2017)
Click here to see higher resolution photo
Ref - 2660
Photo - Andy Glendinning
New buffer stops on Bedale Siding (25/06/2017)
Click here to see higher resolution photo
Ref - 2661
Photo - Michael Metcalfe
20166 with works train and Road Rail Vehicle at Peter Blacks UWC (User Worked Crossing). (22/06/2017)
Click here to see higher resolution photo
Ref - 2662
Photo - Michael Metcalfe
Materials unloaded at Leyburn for the points installation. The Story Rail hired in Road Rail Vehicle unloading flat bottom rail. (22/06/2017)
Click here to see higher resolution photo
Ref - 2663
Photo - Alastair Connell
The infrastructure Team - A Road Rail Grab lifting the old sleepers at Leyburn East where the points for the new Leyburn loop are to be installed (22/06/2017)
Click here to see higher resolution photo
Ref - 2664
Photo - Andy Glendinning
Mind the gap! End of play on 22nd June Leyburn East (22/06/2017)
Click here to see higher resolution photo
Ref - 2665
Photo - Michael Metcalfe
20166 Sits in Leyburn Station overnight loaded with bullhead rails for a drop on Preston bank the next morning. (22/06/2017)
Click here to see higher resolution photo
Ref - 2666
Photo - Alastair Connell
The infrastructure Team - Preparing the trackbed ready for installation of east points for the new Leyburn loop (23/06/2017)
Click here to see higher resolution photo
Ref - 2667
Photo - Michael Metcalfe
The infrastructure Team - Several rails were cut to fit for the new points at Leyburn East. (23/06/2017)
Click here to see higher resolution photo
Ref - 2668
Photo - Alastair Connell
The infrastructure Team - The east points for the new Leyburn loop being installed (23/06/2017)
Click here to see higher resolution photo
Ref - 2669
Photo - Andy Glendinning
State of play start of the day at Leyburn East (24/06/2017)
Click here to see higher resolution photo
Ref - 2670
Photo - Alastair Connell
The infrastructure Team - The east points for the new Leyburn loop being installed (24/06/2017)
Click here to see higher resolution photo
Ref - 2671
Photo - Andy Glendinning
Dropping ballast at Leyburn East (24/06/2017)
Click here to see higher resolution photo
Ref - 2672
Photo - Michael Metcalfe
The infrastructure Team - This man is totally responsible for the excessive amount of ballast in the four foot - so we had a couple of hours of extra shovelling....!!! He opened the dogfish door too wide...! (The dogfish is a ballast hopper wagon) (24/06/2017)
Click here to see higher resolution photo
Ref - 2673
Photo - Andy Glendinning
First passenger train hauled by loco 20166 approaching the new points at Leyburn East (24/06/2017)
Click here to see higher resolution photo
Ref - 2674
Photo - Andy Glendinning
New points at Leyburn East (24/06/2017)
Click here to see higher resolution photo
Ref - 2675
Photo - Michael Metcalfe
The infrastructure Team - Dumper removing the spoil and a start been made to repair Peter Blacks UWC (User Worked Crossing) deck which got damaged when the Road Rail Vehicle had to use it to change rail/road operation. The deck was not in good condition so an improvement was made. (23/06/2017)
Click here to see higher resolution photo
Ref - 2676
Photo - Michael Metcalfe
Peter Blacks UWC (User Worked Crossing) after having the gap between sleepers filled with gravel and all the loose sleepers which were on the lead up to it from the left have been removed and infilled with gravel/waste. A temporary repair? (26/06/2017)
Click here to see higher resolution photo
Tip - You may find it better to view the pictures in 'full screen' mode - For most browsers F11 will toggle this on and off
date_default_timezone_set("Europe/London"); ?>© 2025 Wensleydale Railway