Wensleydale Railway - Photo Archive


October 2017
Photographs
This month we have:-
1. Views of various trains on the railway.
2. The 'polytunnel' being dismantled at Leeming Bar in readiness for the construction of a shed.
3. The ex Briggs footbridge is now at Prest Engineering.
4. Work by the Direct Works Team at Scruton and Leeming Bar.
5. The infrastructure Team.
6. The vegetation Team at work.
7. 37146 leaving the railway by low loader.
8. The track being replaced through Yafforth Level Crossing. See also the dedicated Yafforth Crossing page showing the work in much greater detail.

Ref - 2931
Photo - Andy Glendinning
37674 stands at Redmire at the head of the afternoon tea train, its first passenger run for some time (03/10/2017)
Click here to see higher resolution photo
Ref - 2931
Photo - Andy Glendinning
37674 stands at Redmire at the head of the afternoon tea train, its first passenger run for some time (03/10/2017)
Click here to see higher resolution photo
Ref - 2932
Photo - Andy Glendinning
Passengers prepare to board the last Afternoon Tea Train of the year at Bedale (24/10/2017)
Click here to see higher resolution photo
Ref - 2933
Photo - Andy Glendinning
Coach M5241 shown decorated for a wedding party the next day (26/10/2017)
Click here to see higher resolution photo
Ref - 2934
Photo - Andy Glendinning
Last day of the Purple timetable this year and the last train, the 1705 Redmire-Leeming Bar, stands at Leyburn in the dark (31/10/2017)
Click here to see higher resolution photo
Ref - 2935
Photo - Andy Glendinning
31452 and 31190 having run from Derby had picked up 31459 from Castle Hills to form the 0Z31 Northallerton-Bishop Auckland West (03/10/2017)
Click here to see higher resolution photo
Ref - 2936
Photo - Andy Glendinning
The polytunnel at Leeming Bar ready to come down to make way for the new shed (15/10/2017)
Click here to see higher resolution photo
Ref - 2937
Photo - Andy Glendinning
With the PVC sheeting removed the previous day from the Leeming Bar polytunnel, just the frame is now to come down - It is being removed to make way for the new shed (17/10/2017)
Click here to see higher resolution photo
Ref - 2938
Photo - Andy Glendinning
The frame of the polytunnel at Leeming Bar being dismantled - It is being removed to make way for the new shed (17/10/2017)
Click here to see higher resolution photo
Ref - 2939
Photo - Andy Glendinning
The polytunnel at Leeming Bar is now gone. Everything has been put onto the Salmon truck to go for store for future use. - It was removed to make way for the new shed (17/10/2017)
Click here to see higher resolution photo
Ref - 2940
Photo - Timothy Edwards
The ex Briggs station footbridge has now been moved from the Leeming Bar station car park to nearby Prest Engineering to be refurbished. It will then go to Leyburn when work on a small section of platform on the other side of the line has been completed. (24/10/2017)
Click here to see higher resolution photo
Ref - 2941
Photo - John Tong
Scruton Crossing Gate - The Direct Works Team checking the West Gate Post.
The gate post had moved slightly due to the weight of the gate causing the supporting concrete to crack (11/10/2017)Click here to see higher resolution photo
Ref - 2942
Photo - John Tong
Scruton Crossing Gate - The Direct Works Team re-concreting the Post.
The gate post had moved slightly due to the weight of the gate causing the supporting concrete to crack (11/10/2017)Click here to see higher resolution photo
Ref - 2943
Photo - John Tong
Scruton Crossing Gate - The Direct Works Team finalising the top of the concrete.
The gate post had moved slightly due to the weight of the gate causing the supporting concrete to crack (11/10/2017)Click here to see higher resolution photo
Ref - 2944
Photo - John Tong
Leeming Bar platform - The Direct Works Team relaying the first coping stone to make the platform good again (01/11/2017)
Click here to see higher resolution photo
Ref - 2945
Photo - John Tong
Leeming Bar platform - The Direct Works Team cementing the first coping stone in place (01/11/2017)
Click here to see higher resolution photo
Ref - 2946
Photo - John Tong
Leeming Bar platform - The Direct Works Team relaying the last of the disturbed coping stones (01/11/2017)
Click here to see higher resolution photo
Ref - 2947
Photo - John Tong
Leeming Bar platform - The Direct Works Team have now completed the repairs to the platform coping stones (01/11/2017)
Click here to see higher resolution photo
Ref - 2948
Photo - John Tong
Leeming Bar platform - The Direct Works Team about to lift the rear platform stone (01/11/2017)
Click here to see higher resolution photo
Ref - 2949
Photo - John Tong
Leeming Bar platform - The Direct Works Team have lifted the rear platform stone (01/11/2017)
Click here to see higher resolution photo
Ref - 2950
Photo - John Tong
Leeming Bar platform - The Direct Works Team nudging the rear platform stone into place (01/11/2017)
Click here to see higher resolution photo
Ref - 2951
Photo - John Tong
Scruton Crossing Gate - The refixing of the west level crossing gate by the Direct Works Team is now completed (01/11/2017)
Click here to see higher resolution photo
Ref - 2952
Photo - John Tong
Scruton Crossing Gate - The Direct Works Team starting work starts on east level crossing gate (01/11/2017)
Click here to see higher resolution photo
Ref - 2953
Photo - Andy Waite
The Infrastructure Team stripping usable bolts and fittings from the disused head shunt at Leeming Bar (14/10/2017)
Click here to see higher resolution photo
Ref - 2954
Photo - Andy Waite
The infrastructure team erected some racking in the storage container at Bedale. (14/10/2017)
Click here to see higher resolution photo
Ref - 2955
Photo - Andy Waite
The Infrastructure Team's new storage container at Bedale is now nearly full of equipment (01/11/2017)
Click here to see higher resolution photo
Ref - 2956
Photo - Alan Graham
The remains of a giant willow tree that the Vegetation Team cleared at Ainderby Steeple (25/10/2017)
Click here to see higher resolution photo
Ref - 2957
Photo - Alan Graham
The Vegetation Team were working west of Finghall clearing Blackthorn which was encroaching onto the line - Here showing the area which has been cleared (01/11/2017)
Click here to see higher resolution photo
Ref - 2958
Photo - Alan Graham
The Vegetation Team were working west of Finghall clearing Blackthorn which was encroaching onto the line - here the team are having their lunch break (01/11/2017)
Click here to see higher resolution photo
Ref - 2959
Photo - Alan Graham
The Vegetation Team were working west of Finghall clearing Blackthorn which was encroaching onto the line - here the team are having their lunch break (01/11/2017)
Click here to see higher resolution photo
Ref - 2960
Photo - Alan Graham
The Vegetation Team were working west of Finghall clearing Blackthorn which was encroaching onto the line - Here showing where the team had got to by the end of the day. The encroaching Blackthorn can be seen in the distance (01/11/2017)
Click here to see higher resolution photo
Ref - 2961
Photo - Andy Glendinning
37146 at Leeming Bar ready to leave the Wensleydale Railway (26/10/2017)
Click here to see higher resolution photo
Ref - 2962
Photo - Andy Glendinning
Hiab and trailer back into the car park at Leeming Bar (26/10/2017)
Click here to see higher resolution photo
Ref - 2963
Photo - Andy Glendinning
The Hiab prepares to remove ramp sections from the back of the low loader (26/10/2017)
Click here to see higher resolution photo
Ref - 2964
Photo - Andy Glendinning
37146 propelled to the bottom of the ramp ready to be loaded onto a low loaded (26/10/2017)
Click here to see higher resolution photo
Ref - 2965
Photo - Andy Glendinning
37146 being winched aboard the low loader whose hydraulics have been adjusted to match the slope of the ramp' (26/10/2017)
Click here to see higher resolution photo
Ref - 2966
Photo - Andy Glendinning
Final positioning of 37146 on the low loader (26/10/2017)
Click here to see higher resolution photo
Ref - 2923
Photo - Alastair Connell
Yafforth Level Crossing Replacement - Lifting the old deck units (20/10/2017)
Click here to see higher resolution photo
Ref - 2924
Photo - Andy Waite
Yafforth Level Crossing Replacement - The old sleepers have been removed and removal of the old ballast about to commence (20/10/2017)
Click here to see higher resolution photo
Ref - 2925
Photo - Alastair Connell
Yafforth Level Crossing Replacement - Laying the new sleepers at the crossing (20/10/2017)
Click here to see higher resolution photo
Ref - 2926
Photo - Alastair Connell
Yafforth Level Crossing Replacement - The rails are now in place on the sleepers (21/10/2017)
Click here to see higher resolution photo
Ref - 2927
Photo - Alastair Connell
Yafforth Level Crossing Replacement - The new track over the crossing is now complete (21/10/2017)
Click here to see higher resolution photo
Ref - 2928
Photo - Alastair Connell
Yafforth Level Crossing Replacement - 20166 going over the new track at the crossing (22/10/2017)
Click here to see higher resolution photo
Ref - 2929
Photo - Andy Glendinning
Yafforth Level Crossing Replacement - Last crossing panel goes back into place (22/10/2017)
Click here to see higher resolution photo
Ref - 2930
Photo - Alastair Connell
Yafforth Level Crossing Replacement - The first car over the new crossing (22/10/2017)
Click here to see higher resolution photo
Tip - You may find it better to view the pictures in 'full screen' mode - For most browsers F11 will toggle this on and off
date_default_timezone_set("Europe/London"); ?>© 2025 Wensleydale Railway