Wensleydale Railway - Photo Archive


September 2020
Photographs

Work continues on the redecoration of Leeming Bar Station House which was supported by a Heritage Lottery Grant. However the main focus of work this month has been the preparation work and the start of the major Army Railway Exercise by the Royal Engineers on our railway. They are renewing Wensley Level Crossing, relaying a section of track near Harmby, replacing structural timberwork on the Swale Bridge, along with several other smaller jobs. These are all jobs designed to help the training of the Army Sappers in railway work. This is the first time in about 50 years that the Army has done such an exercise in this country.
This month we have:-
1. Preparation work for the major Army infrastructure exercise on our railway.
2. The first few day of the Army Exercise on our railway.
3. Some work by the Bedale Station Support Group.
4. The leaving do for our Volunteer Coordinator Helan Ashworth. She has left for a new job in Thirsk
5. The restoration of coaches for the Polar Express supported by the Heritage Lottery Fund continues.
6. The restoration of diesel locomotive 33035 is continuing.
7. The Restoration by the Direct Works Team of a Waiting Room Bench for the retored Leeming Bar Station House is progressing.
8. Work by the Direct Works Team on the old Whickam Trolley shed which was moved to Scruton continues.
9. The Temporary Portacabin offices have now been removed from Leeming Bar.
10. The Vegetation Team now have a new storage container at Bedale
11. Work by the Vegetation Team at various locations.
You can see more photos of the work carried out on our line by the Army during this month here

Ref - 6294
Photo - Andy Glendinning
Prep Work for the track replaying project to be done by the Army - Selby, Barlow Tip branch, recovering sleepers for the relay at Argill Farm by the Army Reserve. Uncovered sleepers in the foreground, the jungle from which we recovered them behind. (10/09/2020)
Click here to see higher resolution photo
Ref - 6294
Photo - Andy Glendinning
Prep Work for the track replaying project to be done by the Army - Selby, Barlow Tip branch, recovering sleepers for the relay at Argill Farm by the Army Reserve. Uncovered sleepers in the foreground, the jungle from which we recovered them behind. (10/09/2020)
Click here to see higher resolution photo
Ref - 6296
Photo - Andy Glendinning
Prep Work for the track replaying project to be done by the Army - As far as we got in removing sleepers from the Barlow Tip branch, Selby. (11/09/2020)
Click here to see higher resolution photo
Ref - 6297
Photo - Andy Glendinning
Prep Work for the track replaying project to be done by the Army - The last four sleepers being uplifted from the Barlow Tip branch, Selby. (11/09/2020)
Click here to see higher resolution photo
Ref - 6298
Photo - Unknown Photographer
Prep Work for the Track Relaying project by the Army at Harmby. The recovered concrete sleepers are all now at Redmire. (19/09/2020)
Click here to see higher resolution photo
Ref - 6300
Photo - John Slaughter
Bedale signal box in early morning sunshine awaiting the engineering trains on the following days. (22/09/2020)
Click here to see higher resolution photo
Ref - 6301
Photo - Andy Glendinning
Prep work for Wensley Crossing replacement by the Army - Unloading Polysafe crossing units in the pouring rain at Wensley for the crossing deck replacement. (23/09/2020)
Click here to see higher resolution photo
Ref - 6302
Photo - Andy Glendinning
Prep work for Wensley Crossing replacement by the Army - Not a lot of room but the fork lift can turn in almost its own footprint. (23/09/2020)
Click here to see higher resolution photo
Ref - 6303
Photo - Andy Glendinning
Prep work for Wensley Crossing replacement by the Army - Last kerb goes down. (23/09/2020)
Click here to see higher resolution photo
Ref - 6304
Photo - Andy Glendinning
Prep work for Wensley Crossing replacement by the Army - Kerbs for the crossing. (23/09/2020)
Click here to see higher resolution photo
Ref - 6305
Photo - Andy Glendinning
Exercise Turnout 20 : Day 0 - The Army Reserve excavator prepares to load onto the Flatrol at Redmire before heading to Leyburn. A few of the sleepers from Selby in the foreground. (27/09/2020)
Click here to see higher resolution photo
Ref - 6306
Photo - Andy Glendinning
Prep work for Wensley Crossing replacement by the Army - Panels for the crossing. (23/09/2020)
Click here to see higher resolution photo
Ref - 6312
Photo - Andy Glendinning
Exercise Turnout 20 : Day 0 - Unloading at Peter Blacks User Worked Crossing at Leyburn. (27/09/2020)
Click here to see higher resolution photo
Ref - 6313
Photo - Andy Glendinning
Exercise Turnout 20 : Day 0 - Busy time in the Dairy Yard at Redmire by the Army. (27/09/2020)
Click here to see higher resolution photo
Ref - 6314
Photo - Andy Glendinning
Exercise Turnout 20 : Day 0 - Back at Redmire ready to load the bulldozer. (27/09/2020)
Click here to see higher resolution photo
Ref - 6317
Photo - Michael Metcalfe
Exercise Turnout 20 : Day 1 - Colas Rail 56094 on the river bridge at Morton on Swale with 2 wagon loads of flat bottom rail for the start of the 2 week infrastructure Army Exercise. (28/09/2020)
Click here to see higher resolution photo
Ref - 6319
Photo - Michael Metcalfe
Exercise Turnout 20 : Day 1 - 56094 in Leeming Bar Station. (28/09/2020)
Click here to see higher resolution photo
Ref - 6320
Photo - Andy Glendinning
Exercise Turnout 20 : Day 1 - The incoming train of rail donated by Network Rail pauses on its way to Leyburn to unload. (28/09/2020)
Click here to see higher resolution photo
Ref - 6324
Photo - Andy Glendinning
Exercise Turnout 20 : Day 1 - Having run round in Constable Burton Loop 56094 propels the rail wagons and the newly restored Shark ballast plough over Peter Blacks UWC. (28/09/2020)
Click here to see higher resolution photo
Ref - 6325
Photo - Michael Metcalfe
Exercise Turnout 20 : Day 1 - Recently restored Shark Van been propelled into Leyburn for the rails to be unloaded. (28/09/2020)
Click here to see higher resolution photo
Ref - 6329
Photo - Unknown Photographer
Exercise Turnout 20 : Day 1 - Getting ready to lift the first rail off the train at Wensley using an Army machine (28/09/2020)
Click here to see higher resolution photo
Ref - 6330
Photo - Michael Metcalfe
Exercise Turnout 20 : Day 1 - Army's tracked Volvo excavator lifting off rails at Leyburn. (28/09/2020)
Click here to see higher resolution photo
Ref - 6337
Photo - Kev Burnitt
The army comes to Leyburn Station (28/09/2020)
Click here to see higher resolution photo
Ref - 6343
Photo - Unknown Photographer
Exercise Turnout 20 : Day 2 - The Army digging out Wensley Crossing (29/09/2020)
Click here to see higher resolution photo
Ref - 6341
Photo - Unknown Photographer
Exercise Turnout 20 : Day 2 - The Army using a heavy equipment to dig out Wensley crossing (29/09/2020)
Click here to see higher resolution photo
Ref - 6347
Photo - Unknown Photographer
Exercise Turnout 20 : Day 2 - The rails though Wensley Crossing being cut by the Army (29/09/2020)
Click here to see higher resolution photo
Ref - 6348
Photo - Kev Burnitt
The army comes to Leyburn Station (30/09/2020)
Click here to see higher resolution photo
Ref - 6349
Photo - Kev Burnitt
The army comes to Leyburn Station (30/09/2020)
Click here to see higher resolution photo
Ref - 6350
Photo - Unknown Photographer
Exercise Turnout 20 : Day 3 - The Army taking some equipment to Swale Bridge using a special road/rail vehicle (30/09/2020)
Click here to see higher resolution photo
Ref - 6353
Photo - Unknown Photographer
Exercise Turnout 20 : Day 3 - The Army starting work on Swale Bridge. They will be replacing all the structural timberwork (30/09/2020)
Click here to see higher resolution photo
Ref - 6354
Photo - Unknown Photographer
Exercise Turnout 20 : Day 3 - The Army starting work on Swale Bridge. They will be replacing all the structural timberwork (30/09/2020)
Click here to see higher resolution photo
Ref - 6254
Photo - Andy Crawford
Bedale Station Group: Alan Cassells with the annual re-paint of the platform edge (21/07/2020)
Click here to see higher resolution photo
Ref - 6255
Photo - Andy Crawford
Bedale Station Group: Brian Harland and Peter Lohmeyer re-pointing the platform fascia whilst socially distanced (21/07/2020)
Click here to see higher resolution photo
Ref - 6256
Photo - John Slaughter
Bedale Station Group: Brian Harland and Peter Lohmeyer repointing the brickwork and coping stones of the station platform. (08/09/2020)
Click here to see higher resolution photo
Ref - 6257
Photo - John Slaughter
Bedale Station Group: Peter Lohmeyer and Brian Harland repointing the brickwork and coping stones of the station platform. (08/09/2020)
Click here to see higher resolution photo
Ref - 6258
Photo - Timothy Edwards
Helen Ashworth - our Volunteer Coordinator left the railway this month for a new job in Thirsk. Here she is trying out a new Boot Scraper made out of an old rail chair which was presented to her. (16/09/2020)
Click here to see higher resolution photo
Ref - 6259
Photo - Timothy Edwards
Helen Ashworth - our Volunteer Coordinator left the railway this month for a new job in Thirsk. Here she is trying out a new Boot Scraper made out of an old rail chair which was presented to her. On the right is Bob Coombs who is leading the decoration of Leeming Bar Station House following its restoration (16/09/2020)
Click here to see higher resolution photo
Ref - 6260
Photo - Timothy Edwards
A close up of new Boot Scraper made out of an old rail chair which was presented to Helen Ashworth on her departure from the railway. (16/09/2020)
Click here to see higher resolution photo
Ref - 6261
Photo - Timothy Edwards
Helen Ashworth - our Volunteer Coordinator left the railway this month for a new job in Thirsk. Here she is being presented with flowers by Andy Glendinning (16/09/2020)
Click here to see higher resolution photo
Ref - 6262
Photo - Timothy Edwards
Helen Ashworth - our Volunteer Coordinator left the railway this month for a new job in Thirsk. Here she is thanking all the volunteers who turned up to say goodbye. (16/09/2020)
Click here to see higher resolution photo
Ref - 6263
Photo - Joan Walker
Helen Ashworth - our Volunteer Coordinator left the railway this month for a new job in Thirsk. Here she is thanking all the volunteers who turned up to say goodbye. (16/09/2020)
Click here to see higher resolution photo
Ref - 6264
Photo - Andy Glendinning
Well spaced at Helen Ashworth's leaving do. (16/09/2020)
Click here to see higher resolution photo
Ref - 6265
Photo - Unknown Photographer
Work is continuing on the Mk2 coaches to make them ready for Polar Express. Paintwork preparations continue on both vehicles with 5378 now having its first proper undercoat on the lower half. (--/09/2020)
Click here to see higher resolution photo
Ref - 6266
Photo - Unknown Photographer
Work is continuing on the Mk2 coaches to make them ready for Polar Express. Coach 6163 receiving its guide coat of light grey to check for imperfections. (--/09/2020)
Click here to see higher resolution photo
Ref - 6267
Photo - Unknown Photographer
Work is continuing on the Mk2 coaches to make them ready for Polar Express. The welcome return of the SAGA club on a Tuesday has seen the brake rigging replaced on 6163. A great effort by them. (--/09/2020)
Click here to see higher resolution photo
Ref - 6268
Photo - Unknown Photographer
Finally some paint is going on the MK2 coaches! Here you can see the first top coat of rail blue freshly applied. Going forward all of our air brake stock will be blue and grey and all vacuum stock will be maroon covering two eras of railway liveries. Great effort by all involved! (20/09/2020)
Click here to see higher resolution photo
Ref - 6269
Photo - Unknown Photographer
Introducing the latest member to our team! As head of Permanent Way and Infrastructure Toby Lampitt has joined us bringing with him his knowledge from other operators on the railway network including the Isle of Man steam railway. Toby has previously volunteered at the railway on some of the bigger track projects and is a welcome addition to the team. (--/09/2020)
Click here to see higher resolution photo
Ref - 6270
Photo - Unknown Photographer
Work is continuing on the restoration of 33035 by Pioneer Diesel Ltd. Here showing off a brand new set of snow ploughs. Thanks to Pete Burrows and the South Devon Diesel team! For allowing us to use a set of their ploughs as a copy for these to be manufactured. (18/09/2020)
Click here to see higher resolution photo
Ref - 6271
Photo - Unknown Photographer
Work is continuing on the restoration of 33035 by Pioneer Diesel Ltd. Here showing off a brand new set of snow ploughs. Thanks to Pete Burrows and the South Devon Diesel team! For allowing us to use a set of their ploughs as a copy for these to be manufactured. In this view the middle plough has been removed as it is sitting too low and the bracket needs modification (18/09/2020)
Click here to see higher resolution photo
Ref - 6272
Photo - Joan Walker
Progress on Restoration of Leeming Bar Station Waiting Room Bench by the Direct Works Team. (09/09/2020)
Click here to see higher resolution photo
Ref - 6273
Photo - Joan Walker
Progress on Restoration of Leeming Bar Station Waiting Room Bench by the Direct Works Team. (09/09/2020)
Click here to see higher resolution photo
Ref - 6274
Photo - Joan Walker
Leeming Bar Station Waiting Room Bench is now covered with felt prior to outer cover being fitted by the Direct Works Team. (16/09/2020)
Click here to see higher resolution photo
Ref - 6275
Photo - John Tong
The Direct Works Team working on insulating the old Whickam Trolley Hut which is now at Scruton and being prepared for use by the DWT - Batons being cut for holding the insulation. (30/09/2020)
Click here to see higher resolution photo
Ref - 6276
Photo - John Tong
The Direct Works Team working on insulating the old Whickam Trolley Hut which is now at Scruton and being prepared for use by the DWT - Here the insulation is being covered. (30/09/2020)
Click here to see higher resolution photo
Ref - 6277
Photo - John Tong
The Direct Works Team working on insulating the old Whickam Trolley Hut which is now at Scruton and being prepared for use by the DWT - Covering of the insulation is nearly finished. (30/09/2020)
Click here to see higher resolution photo
Ref - 6278
Photo - Andy Glendinning
Moving day at Leeming Bar. Removing the temporary portacabin offices (16/09/2020)
Click here to see higher resolution photo
Ref - 6279
Photo - Andy Glendinning
The temporary offices depart from Leeming Bar. (16/09/2020)
Click here to see higher resolution photo
Ref - 6280
Photo - Andy Glendinning
Spotted having a rest at Crakehall while refreshing crossing keepers for the forthcoming Army Reserve exercise. (18/09/2020)
Click here to see higher resolution photo
Ref - 6281
Photo - Steve Hall
The vegetation team receiving a new home for their equipment at the location that's been cleared and made ready for it at Bedale Oil Dock, west of the signal box. (05/09/2020)
Click here to see higher resolution photo
Ref - 6282
Photo - Steve Hall
The vegetation team receiving a new home for their equipment at the location that's been cleared for it at Bedale Oil Dock, west of the signal box. (05/09/2020)
Click here to see higher resolution photo
Ref - 6283
Photo - Alan Graham
The vegetation team clearing sight lines at a farm crossing east of Leeming Bar station. (02/09/2020)
Click here to see higher resolution photo
Ref - 6284
Photo - Alan Graham
The vegetation team have cleared overhanging branches and undergrowth to improve sight lines at a farm crossing east of Leeming Bar station. (02/09/2020)
Click here to see higher resolution photo
Ref - 6285
Photo - Alan Graham
A section of track where the vegetation team have strimmed back vegetation to improve level crossing visibility, this time at Blind Lane between Bedale station and Aiskew level crossing. (16/09/2020)
Click here to see higher resolution photo
Ref - 6286
Photo - Alan Graham
The vegetation team working at Blind Lane between Bedale station and Aiskew level crossing on an overcast day. (16/09/2020)
Click here to see higher resolution photo
Ref - 6287
Photo - Alan Graham
In conditions to test everybody's waterproofs the vegetation team worked in a heavy downpour lasting all day to remove the risk of this dead lime tree falling on to the track between Bedale and Aiskew. (23/09/2020)
Click here to see higher resolution photo
Ref - 6288
Photo - Bill Briggs
The dead lime tree brought safely to earth. The vegetation team can now get to grips with clearing the tracks, creating logs and burning brash. (23/09/2020)
Click here to see higher resolution photo
Ref - 6289
Photo - Bill Briggs
The vegetation team has turned the dead tree in to logs, the brash has been burned and the area made safe. (23/09/2020)
Click here to see higher resolution photo
Ref - 6290
Photo - Alan Graham
The vegetation team arriving on site at Flood Bridge crossing near Aiskew on 30th September getting ready to strim back undergrowth blocking sight lines and visibility at this farm crossing. (30/09/2020)
Click here to see higher resolution photo
Ref - 6291
Photo - Alan Graham
Looking towards Flood Bridge crossing after the vegetation has been cut back to ground level to improve visibility. (30/09/2020)
Click here to see higher resolution photo
Ref - 6292
Photo - Alan Graham
Another 'after' picture at the same crossing showing the triangular taper which has been cut in to the undergrowth by the vegetation team to improve crossing visibility and safety. (30/09/2020)
Click here to see higher resolution photo
Ref - 6293
Photo - Alan Graham
Jobs a good un! All our own work! The vegetation team packing up and ready to go, just before the steady drizzle which had lasted most of the day turned in to another downpour. (30/09/2020)
Click here to see higher resolution photo
Tip - You may find it better to view the pictures in 'full screen' mode - For most browsers F11 will toggle this on and off
date_default_timezone_set("Europe/London"); ?>© 2025 Wensleydale Railway