January 2021
Photographs
Due to the current lockdown only work considered to be safety critical has been continuing. Vegetation and Infrastructure work fall into this category and Infrastructure teams have been very busy during January, working most days of the week carrying out a further track renewal at Argill Farm and also the replacement of Smiths User Worked Crossing.
This month we have:-
1. The Infrastructure teams doing a further track renewal at Argill Farm.
2. The Infrastructure teams replacing Smiths User Worked Crossing.
3. More photos of Rishi Sunak's visit to the railway in December.
4. Various views along the railway.
5. The Vegetation Team in action
A selection of photos of the Infrastructure work is shown below, but for a more detailed view of their work, see the dedicated page showing the work here

Ref - 6632
Photo - Alex Lomax
Argil Track Renewal - Although the first working week of 2021 isn't what any of us had hoped for here are a couple of images from the works train heading to Argill farm where some finishing off work needs completing following October's exercise. (04/01/2021)
Click here to see higher resolution photo
Ref - 6632
Photo - Alex Lomax
Argil Track Renewal - Although the first working week of 2021 isn't what any of us had hoped for here are a couple of images from the works train heading to Argill farm where some finishing off work needs completing following October's exercise. (04/01/2021)
Click here to see higher resolution photo
Ref - 6599
Photo - Michael Metcalfe
Argil Track Renewal - Works train arrived at Leyburn Peter Blacks UWC for loading of the excavator for transit to the Argill worksite. (04/01/2021)
Click here to see higher resolution photo
Ref - 6600
Photo - Michael Metcalfe
Argil Track Renewal - The excavator was unloaded at Argill Farm UWC - space was tight. (04/01/2021)
Click here to see higher resolution photo
Ref - 6633
Photo - Alex Lomax
Argil Track Renewal - Class 20 heading a works train transporting transporting the concrete sleepers the track relaying work at Argill farm, to continue on from what the Army did last year. (05/01/2021)
Click here to see higher resolution photo
Ref - 6601
Photo - Michael Metcalfe
Argil Track Renewal - Sleepers are unloaded and stacked up at the Argill worksite. (06/01/2021)
Click here to see higher resolution photo
Ref - 6602
Photo - Michael Metcalfe
Argil Track Renewal - Rail been removed by the excavator. (06/01/2021)
Click here to see higher resolution photo
Ref - 6622
Photo - Andy Glendinning
Argil Track Renewal - Argill Farm looking east. Recovering old rail from down the bank at the end of the Army relay. (07/01/2021)
Click here to see higher resolution photo
Ref - 6623
Photo - Andy Glendinning
Argil Track Renewal - Argill Farm looking west.New track in place. (12/01/2021)
Click here to see higher resolution photo
Ref - 6603
Photo - Michael Metcalfe
Argil Track Renewal - A few bad dips and alignment tweaks were Robel packed on the Army laid section. (13/01/2021)
Click here to see higher resolution photo
Ref - 6625
Photo - Andy Glendinning
Argil Track Renewal - The works train arrives at Leyburn. (14/01/2021)
Click here to see higher resolution photo
Ref - 6604
Photo - Michael Metcalfe
Argil Track Renewal - The Seacow ballast hopper being loaded. (14/01/2021)
Click here to see higher resolution photo
Ref - 6631
Photo - Andy Waite
Argil Track Renewal - The works train whilst track relaying at Argill farm (14/01/2021)
Click here to see higher resolution photo
Ref - 6605
Photo - Michael Metcalfe
Smiths User Worked Crossing Replacement - Concrete sleepers for Smiths UWC deck replacement being lifted at Leyburn. These had been earmarked for Smiths for a while now. (15/01/2021)
Click here to see higher resolution photo
Ref - 6606
Photo - Michael Metcalfe
Smiths User Worked Crossing Replacement - These concrete U tubes were under the crossing and fully blocked with silt from water/soil from the road to the right which is uphill. These tubes have been laid on a bed of ballast and will be covered by old upturned concrete sleepers. (18/01/2021)
Click here to see higher resolution photo
Ref - 6626
Photo - Andy Glendinning
Smiths User Worked Crossing Replacement - Drainage work at Smiths User Worked Crossing. (18/01/2021)
Click here to see higher resolution photo
Ref - 6607
Photo - Michael Metcalfe
Smiths User Worked Crossing Replacement - Trackbed dug out ready for replacement. (21/01/2021)
Click here to see higher resolution photo
Ref - 6608
Photo - Michael Metcalfe
Smiths User Worked Crossing Replacement - A good wackering taking place. (22/01/2021)
Click here to see higher resolution photo
Ref - 6630
Photo - Andy Waite
Smiths User Worked Crossing Replacement - The infrastructure team working on replacing Smiths User Worked Crossing (22/01/2021)
Click here to see higher resolution photo
Ref - 6609
Photo - Michael Metcalfe
Smiths User Worked Crossing Replacement - One 120' rail back in. (25/01/2021)
Click here to see higher resolution photo
Ref - 6610
Photo - Michael Metcalfe
Smiths User Worked Crossing Replacement - All sleepers and rails in and jointed up. (26/01/2021)
Click here to see higher resolution photo
Ref - 6611
Photo - Michael Metcalfe
Smiths User Worked Crossing Replacement - View uphill with new deck in. (29/01/2021)
Click here to see higher resolution photo
Ref - 6612
Photo - Michael Metcalfe
Smiths User Worked Crossing Replacement - Final view towards Finghall Station with the JCB loader bringing in more ballast to finish the job off. Just a bit of tidying up left to do. (29/01/2021)
Click here to see higher resolution photo
Ref - 6638
Photo - Philip Sedgewick
A group photo taken during Rishi Sunak's visit to the railway in December (04/12/2020)
Click here to see higher resolution photo
Ref - 6639
Photo - Philip Sedgewick
Rishi Sunak with Carl Les of the railway (04/12/2020)
Click here to see higher resolution photo
Ref - 6644
Photo - Philip Sedgewick
Rishi Sunak speaking with volunteers whilst being shown round Leeming Bar in December (04/12/2020)
Click here to see higher resolution photo
Ref - 6624
Photo - Andy Glendinning
Deep and crisp and even at Leyburn. (14/01/2021)
Click here to see higher resolution photo
Ref - 6634
Photo - Paul Warren
An atmospheric view from Redmire (15/01/2021)
Click here to see higher resolution photo
Ref - 6635
Photo - Paul Warren
An atmospheric view at Redmire (15/01/2021)
Click here to see higher resolution photo
Ref - 6636
Photo - Paul Warren
Frost protection duty on the Pacers, which were started up to keep everything moving and the batteries charged, during this cold weather. (15/01/2021)
Click here to see higher resolution photo
Ref - 6627
Photo - Andy Glendinning
After the snow comes the floods. Taken from the A684 road bridge looking across to Swale Bridge in the distance. The water was almost up to the top of the piers. (20/01/2021)
Click here to see higher resolution photo
Ref - 6628
Photo - Andy Glendinning
By the next day the water level had dropped quite a bit. (21/01/2021)
Click here to see higher resolution photo
Ref - 6629
Photo - Andy Glendinning
Snowy Penhill taken while on a track patrol between Leyburn and Wensley. (27/01/2021)
Click here to see higher resolution photo
Ref - 6645
Photo - Robert Hall
This is where the public footpath from Castle Bolton to the bottom road crosses the trackbed of the line beyond Redmire. Some drainage will certainly be needed here, when we extend the line to Bolton Castle. (07/11/2020)
Click here to see higher resolution photo
Ref - 6637
Photo - Paul Warren
The new LED upgrade WigWag lights for Ham Hall level crossing. They will be fitted shortly after some electrical modification works have been carried out to the crossing control system. (21/01/2021)
Click here to see higher resolution photo
Ref - 6613
Photo - Alan Graham
Continuing the theme of level crossing clearance, the vegetation team's job at Newton Grange in January was to clear vegetation on both sides of the track. (13/01/2021)
Click here to see higher resolution photo
Ref - 6614
Photo - Alan Graham
The vegetation team working at Newton Grange, between Newton-Le-Willows and Crakehall. (13/01/2021)
Click here to see higher resolution photo
Ref - 6615
Photo - Alan Graham
The vegetation team working in a downpour collecting logs and tidying up after themselves at Newton Grange. (20/01/2021)
Click here to see higher resolution photo
Ref - 6616
Photo - Alan Graham
Showing flooding beside the track at Newton Grange on 20th Jan while storm Christoph was at its height. The vegetation team are getting very wet in the far distance, rodding out a duct to get the water away. (20/01/2021)
Click here to see higher resolution photo
Ref - 6617
Photo - Alan Graham
The vegetation team at Newton Grange crossing, rodding out drainage ducting to allow water to escape during Storm Christoph. (20/01/2021)
Click here to see higher resolution photo
Ref - 6618
Photo - Steve Hall
The vegetation team at Newton Grange crossing, rodding out drainage ducting to allow water to escape during Storm Christoph. (20/01/2021)
Click here to see higher resolution photo
Ref - 6648
Photo - Will Burnham
Leeming Bar Station House - Ticket office - The new ticket screens with the shutters down (--/01/2021)
Click here to see higher resolution photo
Ref - 6650
Photo - Will Burnham
Leeming Bar Station House - Ticket office - The outside (paying customers view) of the new ticket screen. Just needs to be painted. (--/01/2021)
Click here to see higher resolution photo
Tip - You may find it better to view the pictures in 'full screen' mode - For most browsers F11 will toggle this on and off
date_default_timezone_set("Europe/London"); ?>© 2025 Wensleydale Railway