Wensleydale Railway - Photo Archive

August 2025
Photographs
During August lots of things has been going on on the railway. On this page we have:
1. Pacers etc. on the line.
2. TV crews filming for a feature on young heritage train drivers.
3. A load of rails arriving at Leeming Bar from Eggborough Power Station.
4. Work at Scruton.
5. Views and work at Redmire.
6. The platform extension at Leeming Bar for Polar Express is completed.
7. More tidying of Leeming Bar yard.
8. Restoration of the bodywork of Mk.2 coach No. 9417is nearly completed.
9. Restoration of the bodywork of Mk.2 coach No.W5337 has started.
10. The Direct Works Team have been carrying out work at Leeming Bar.
11. The installation of a lever frame at Scruton in continuing.
12. The Vegetation team at work.
13. The Infrastructure team at work.
For more photos of the restoration/installation of the lever frame at Scruton see here and here
For more photos of the restoration of the M2 coach No.9417 see here

Ref - 16111
Photo - Alan Graham
The bubble car making its way through Spruce Ghyll at the beginning of August. (13/08/2025)
Click here to see higher resolution photo

Ref - 16111
Photo - Alan Graham
The bubble car making its way through Spruce Ghyll at the beginning of August. (13/08/2025)
Click here to see higher resolution photo

Ref - 16112
Photo - Unknown
Never a dull moment for the veg team as these curious ladies gather to inspect one of our volunteers. (13/08/2025)
Click here to see higher resolution photo

Ref - 16113
Photo - John Slaughter
Leeming Bar - Pacer 143 623 preparing to depart on the 11.50 service to Scruton (06/08/2025)
Click here to see higher resolution photo

Ref - 16114
Photo - John Slaughter
Leeming Bar - Pacer 143 623 departing on the 11.50 service to Scruton passing loco 47 714 (06/08/2025)
Click here to see higher resolution photo

Ref - 16115
Photo - John Slaughter
Leeming Bar: filming for a feature on young train drivers: Oliver Kirkby being interviewed. (06/08/2025)
Click here to see higher resolution photo

Ref - 16116
Photo - John Slaughter
Leeming Bar: filming for a feature on young train drivers: Oliver Kirkby being interviewed (06/08/2025)
Click here to see higher resolution photo

Ref - 16117
Photo - John Slaughter
Leeming Bar: filming for a feature on young train drivers: Oliver Kirkby being interviewed (06/08/2025)
Click here to see higher resolution photo

Ref - 16118
Photo - John Slaughter
Leeming Bar: a group photo being taken after the filming of the 3 young train drivers, the camera man and the interviewer (06/08/2025)
Click here to see higher resolution photo

Ref - 16119
Photo - John Slaughter
Leeming Bar: checking the group photo. (06/08/2025)
Click here to see higher resolution photo

Ref - 16120
Photo - John Slaughter
Oliver Kirkby shows a green flag to the 11.50 train from Leeming Bar to Scruton, to permit it to proceed over Leeming Bar Crossing. (06/08/2025)
Click here to see higher resolution photo

Ref - 16121
Photo - John Slaughter
Leeming Bar Station - opening the crossing gates for the road as Pacer 143 623 recedes into the distance towards Scruton. (06/08/2025)
Click here to see higher resolution photo

Ref - 16122
Photo - Timothy Edwards
The area beyond the signal box at Leeming Bar has been cleared for future use. (05/08/2025)
Click here to see higher resolution photo

Ref - 16123
Photo - Timothy Edwards
The area beyond the signal box at Leeming Bar has been cleared for future use. (19/08/2025)
Click here to see higher resolution photo

Ref - 16124
Photo - Timothy Edwards
A load of rails arriving at Leeming Bar from Eggborough Power Station. We have been given these rails, although we are having to pay the transport costs, which are very expensive. Please consider helping donating to our new 'Securing Our Future' appeal. (19/08/2025)
Click here to see higher resolution photo

Ref - 16125
Photo - Timothy Edwards
A load of rails arriving at Leeming Bar from Eggborough Power Station. We have been given these rails, although we are having to pay the transport costs, which are very expensive. Please consider helping donating to our new 'Securing Our Future' appeal. (19/08/2025)
Click here to see higher resolution photo

Ref - 16126
Photo - Dave Fielding
The Direct Works Team have finished the cover of the Water Bore Hole at Scruton (12/08/2025)
Click here to see higher resolution photo

Ref - 16127
Photo - Timothy Edwards
David Harrison working on repairing one of the Scruton Level Crossing Gates (26/08/2025)
Click here to see higher resolution photo

Ref - 16128
Photo - John Hodgson
Redmire - Additional access under construction from carpark to platform. Looking up the ramp from the platform (03/08/2025)
Click here to see higher resolution photo

Ref - 16129
Photo - John Hodgson
Redmire. Looking down the new ramp to the platform from the carpark (12/08/2025)
Click here to see higher resolution photo

Ref - 16130
Photo - John Hodgson
Looking west across Redmire's carpark to the Weigh Office and the timber shelter (12/08/2025)
Click here to see higher resolution photo

Ref - 16131
Photo - Stead Collection
A pre World War Two photo of Redmire station (Date unknown)
Click here to see higher resolution photo

Ref - 16132
Photo - John Hodgson
A view of Redmire station - Compare the the previous photo of around a 100 years ago (26/08/2025)
Click here to see higher resolution photo

Ref - 16133
Photo - Timothy Edwards
The platform extension at Leeming Bar is now complete except for the fencing. (05/08/2025)
Click here to see higher resolution photo

Ref - 16134
Photo - Timothy Edwards
The platform extension at Leeming Bar is now complete except for the fencing. (12/08/2025)
Click here to see higher resolution photo

Ref - 16135
Photo - Timothy Edwards
The platform extension at Leeming Bar is now being fenced by our Fencing Team (19/08/2025)
Click here to see higher resolution photo

Ref - 16136
Photo - Timothy Edwards
The platform extension at Leeming Bar is now being fenced by our Fencing Team (19/08/2025)
Click here to see higher resolution photo

Ref - 16137
Photo - Timothy Edwards
The platform extension and associated fencing at Leeming Bar is now complete (26/08/2025)
Click here to see higher resolution photo

Ref - 16138
Photo - Timothy Edwards
The platform extension and associated fencing at Leeming Bar is now complete (26/08/2025)
Click here to see higher resolution photo

Ref - 16139
Photo - Timothy Edwards
The area in Leeming Bar yard adjacent to the platform is being cleared and levelled in readiness for constructing an ash pit next year for steam locomotives (05/08/2025)
Click here to see higher resolution photo

Ref - 16140
Photo - Timothy Edwards
The area in Leeming Bar yard adjacent to the platform is being cleared and levelled in readiness for constructing an ash pit next year for steam locomotives. A retaining wall will need to be built to protect the platform edge. (12/08/2025)
Click here to see higher resolution photo

Ref - 16141
Photo - Timothy Edwards
The area in Leeming Bar yard adjacent to the platform is being cleared and levelled in readiness for constructing an ash pit next year for steam locomotives. A retaining wall will need to be built to protect the platform edge. (19/08/2025)
Click here to see higher resolution photo

Ref - 16142
Photo - Timothy Edwards
Leeming Bar yard is being cleared and levelled in readiness for constructing an ash pit next year adjacent to the platform for steam locomotives. (12/08/2025)
Click here to see higher resolution photo

Ref - 16143
Photo - Timothy Edwards
Pacer unit 142018 in Leeming Bar platform having some work done on it (12/08/2025)
Click here to see higher resolution photo

Ref - 16169
Photo - Timothy Edwards
The Mk2 brake coach No.9417 is being restored for use with the Polar Express train (05/08/2025)
Click here to see higher resolution photo

Ref - 16170
Photo - Timothy Edwards
The Mk2 brake coach No.9417 is being restored for use with the Polar Express train. The green primerpainted area has seen some new bodywork welded in (05/08/2025)
Click here to see higher resolution photo

Ref - 16173
Photo - Timothy Edwards
The Mk2 brake coach No.9417 is being restored for use with the Polar Express train. Primer paint is being applied (12/08/2025)
Click here to see higher resolution photo

Ref - 16175
Photo - Timothy Edwards
The Mk2 brake coach No.9417 is being restored for use with the Polar Express train. Primer paint is being applied (12/08/2025)
Click here to see higher resolution photo

Ref - 16176
Photo - Timothy Edwards
The Mk2 brake coach No.9417 is being restored for use with the Polar Express train. Now got a gloss top coat applied. (19/08/2025)
Click here to see higher resolution photo

Ref - 16178
Photo - Timothy Edwards
The Mk2 brake coach No.9417 is being restored for use with the Polar Express train. Now got a gloss top coat applied. (19/08/2025)
Click here to see higher resolution photo

Ref - 16179
Photo - Timothy Edwards
The Mk2 brake coach No.9417 is being restored for use with the Polar Express train. Now got a final gloss top coat and lining applied. Its looking really smart. (26/08/2025)
Click here to see higher resolution photo

Ref - 16180
Photo - Timothy Edwards
The Mk2 brake coach No.9417 is being restored for use with the Polar Express train. Now got a final gloss top coat and lining applied. Its looking really smart. (26/08/2025)
Click here to see higher resolution photo

Ref - 16144
Photo - Timothy Edwards
The seat cushions for the restored coaches have had the covering material removed from them in readiness to being sent away fro recovering by a specialist company (19/08/2025)
Click here to see higher resolution photo

Ref - 16181
Photo - Timothy Edwards
The Mk2 coach No.W5337 is now starting to be restored for use with the Polar Express train. (19/08/2025)
Click here to see higher resolution photo

Ref - 16183
Photo - Timothy Edwards
The Mk2 coach No.W5337 is now starting to be restored for use with the Polar Express train. (19/08/2025)
Click here to see higher resolution photo

Ref - 16184
Photo - Timothy Edwards
The Mk2 coach No.W5337 is now starting to be restored for use with the Polar Express train. (26/08/2025)
Click here to see higher resolution photo

Ref - 16186
Photo - Timothy Edwards
The Wickham trolley is now complete and looking very nice (12/08/2025)
Click here to see higher resolution photo

Ref - 16145
Photo - Dave Fielding
The Direct Works Team digging a trench at the West end of the Maintenance Shed at Leeming Bar for drainage pipes to take water away to avoid flooding (12/08/2025)
Click here to see higher resolution photo

Ref - 16146
Photo - Dave Fielding
The Direct Works Team digging a trench at the West end of the Maintenance Shed at Leeming Bar for drainage pipes to take water away to avoid flooding (12/08/2025)
Click here to see higher resolution photo

Ref - 16147
Photo - Dave Fielding
The Direct Works Team digging a trench at the West end of the Maintenance Shed at Leeming Bar for drainage pipes to take water away to avoid flooding (12/08/2025)
Click here to see higher resolution photo

Ref - 16148
Photo - Derek Barnes
The Direct Works Team digging a trench at the West end of the Maintenance Shed at Leeming Bar for drainage pipes to take water away to avoid flooding (12/08/2025)
Click here to see higher resolution photo

Ref - 16149
Photo - Derek Barnes
The Direct Works Team digging a trench at the West end of the Maintenance Shed at Leeming Bar for drainage pipes to take water away to avoid flooding (12/08/2025)
Click here to see higher resolution photo

Ref - 16150
Photo - Derek Barnes
The Direct Works Team digging a trench at the West end of the Maintenance Shed at Leeming Bar for drainage pipes to take water away to avoid flooding (12/08/2025)
Click here to see higher resolution photo

Ref - 16151
Photo - Derek Barnes
The Direct Works Team digging a trench at the West end of the Maintenance Shed at Leeming Bar for drainage pipes to take water away to avoid flooding (12/08/2025)
Click here to see higher resolution photo

Ref - 16152
Photo - Derek Barnes
The Direct Works Team digging a trench at the West end of the Maintenance Shed at Leeming Bar for drainage pipes to take water away to avoid flooding (12/08/2025)
Click here to see higher resolution photo

Ref - 16153
Photo - Derek Barnes
The Direct Works Team digging a trench at the West end of the Maintenance Shed at Leeming Bar for drainage pipes to take water away to avoid flooding (12/08/2025)
Click here to see higher resolution photo

Ref - 16154
Photo - Dave Fielding
A new concrete floor being constructed by the Direct Works Team for the undercover area adjacent to the new toilet/shower unit complex at Leeming Bar. (19/08/2025)
Click here to see higher resolution photo

Ref - 16155
Photo - Dave Fielding
A new concrete floor being constructed by the Direct Works Team for the undercover area adjacent to the new toilet/shower unit complex at Leeming Bar. (19/08/2025)
Click here to see higher resolution photo

Ref - 16156
Photo - Dave Fielding
A new concrete floor being constructed by the Direct Works Team for the undercover area adjacent to the new toilet/shower unit complex at Leeming Bar. (19/08/2025)
Click here to see higher resolution photo

Ref - 16157
Photo - Dave Fielding
A new concrete floor being constructed by the Direct Works Team for the undercover area adjacent to the new toilet/shower unit complex at Leeming Bar. (19/08/2025)
Click here to see higher resolution photo

Ref - 16158
Photo - Dave Fielding
A new concrete floor being constructed by the Direct Works Team for the undercover area adjacent to the new toilet/shower unit complex at Leeming Bar. (19/08/2025)
Click here to see higher resolution photo

Ref - 16159
Photo - Derek Barnes
A new concrete floor being constructed by the Direct Works Team for the undercover area adjacent to the new toilet/shower unit complex at Leeming Bar. (19/08/2025)
Click here to see higher resolution photo

Ref - 16160
Photo - Derek Barnes
A new concrete floor has been finished by the Direct Works Team for the undercover area adjacent to the new toilet/shower unit complex at Leeming Bar. (26/08/2025)
Click here to see higher resolution photo

Ref - 16189
Photo - Timothy Edwards
Restoration of a lever frame at Scruton - The spindle has now been put into the side frames (05/08/2025)
Click here to see higher resolution photo

Ref - 16190
Photo - Timothy Edwards
Restoration of a lever frame at Scruton - The top bracket bars have now been bolted to the side frames (05/08/2025)
Click here to see higher resolution photo

Ref - 16195
Photo - Timothy Edwards
Restoration of a lever frame at Scruton - All the quadrants put loosely in position (12/08/2025)
Click here to see higher resolution photo

Ref - 16199
Photo - Timothy Edwards
Restoration of a lever frame at Scruton - The first lever has been now been fitted and the quadrants on either side been bolted down (26/08/2025)
Click here to see higher resolution photo

Ref - 16202
Photo - Timothy Edwards
Restoration of a lever frame at Scruton - Two levers have now been installed and the operation of one of them is being tested (26/08/2025)
Click here to see higher resolution photo

Ref - 16161
Photo - Alan Graham
After drivers reported difficulty in seeing Finghall station as they rounded this bend towards the halt, the vegetation team were asked to reduce the overgrown area to the right which was full of hidden metal, wire and other obstructions. (13/08/2025)
Click here to see higher resolution photo

Ref - 16162
Photo - Alan Graham
Hot work. Members of the veg team take time off to cool sown in sweltering conditions on a hot August day. (13/08/2025)
Click here to see higher resolution photo

Ref - 16163
Photo - Alan Graham
"Making daylight". You have to start somewhere and a member of the veg team makes the first hole in the vegetation at Finmghall. (20/08/2025)
Click here to see higher resolution photo

Ref - 16164
Photo - Michael Metcalfe
A trench is been dug out east of Wensley crossing where sleeper pumping has occurred for many years. Here the first section of drainage pipe wrapped in geotextile material is ready for back filling. (11/08/2025)
Click here to see higher resolution photo

Ref - 16165
Photo - Michael Metcalfe
Once the four foot has been cleared of weeds/mud/excess ballast more sleeper replacement has taken place. (11/08/2025)
Click here to see higher resolution photo

Ref - 16166
Photo - Michael Metcalfe
A weakened tree fell to earth and the first job of the day was to clear the line for traffic. (26/08/2025)
Click here to see higher resolution photo

Ref - 16167
Photo - Michael Metcalfe
Line clear. The rest of the tree needs to come down but was too big a diameter for our chainsaw operative. (26/08/2025)
Click here to see higher resolution photo

Ref - 16168
Photo - Michael Metcalfe
Another 50m of drainage pipe installed in the trench.
Alongside more sleepers are being dug out for replacement. (26/08/2025)Click here to see higher resolution photo