July has been a busy month for the various maintenance, vegetation and infrastructure teams. On this page:-
1. Pacers on our line.
2. Some views at Redmire.
3. The WRT Members train.
4. Work by The Direct Works team at Scruton.
5. The Direct Works team pointing the stonework on Stoop Bridge.
6. Restoration work on the ex LMS guards van continues.
7. Restoration of the Mk2 coach W14073 is slowly continuing.
8. Some point motors (ex Eggborough) are being overhauled
9. The P-way (Infrastructure) teams replacing various rotten sleepers.
10. The Vegetation team at work at various locations.

Ref - 17277
Photo - John Slaughter
Bedale: rear of Pacer 142 018 about to depart on the 11.33 to Leeming Bar, with guard Sue Threadgold checking the doors. (21/07/2026)
Click here to see higher resolution photo

Ref - 17277
Photo - John Slaughter
Bedale: rear of Pacer 142 018 about to depart on the 11.33 to Leeming Bar, with guard Sue Threadgold checking the doors. (21/07/2026)
Click here to see higher resolution photo

Ref - 17278
Photo - John Slaughter
Aiskew level crossing with Pacer 142 018 moving cautiously onto the crossing with the 12.00 Leeming Bar to Leyburn service. (28/07/2026)
Click here to see higher resolution photo

Ref - 17279
Photo - Alan Graham
View from the lineside (just). This was taken on 29th July from the very end of the line (almost at the buffers) - the part no passengers ever got to reach - looking over the village of Redmire and across Wensleydale to Pen Hill. (29/07/2026)
Click here to see higher resolution photo

Ref - 17280
Photo - Alan Graham
A vacant seat at Redmire station. Hopefully it won't be too long before our passengers can use it again and enjoy the view across the line towards Pen Hill. (29/07/2026)
Click here to see higher resolution photo

Ref - 17281
Photo - Alan Graham
The end of the Wensleydale Railway; the buffer stop at Redmire. It's a long time since our railway extended beyond here; not since the middle of the last century. And if you pass this buffer there's only some brambles and a fence to stop you dropping in to Apedale beck. (29/07/2026)
Click here to see higher resolution photo

Ref - 17282
Photo - Alan Graham
If you wonder what you're looking at, it's the drop to the Apedale beck beyond the buffers where a bridge once carried the line further west. Look closely (top middle) and you might make out the remains of the bridge abutments still in situ. I'd have liked to have brought you a better picture but it wasn't possible to get any closer and the area is very overgrown. You'll have to use your imagination. (29/07/2026)
Click here to see higher resolution photo

Ref - 17283
Photo - Claire Jarmain
The WRT members train after arriving back at Leeming Bar (05/07/2026)
Click here to see higher resolution photo

Ref - 17284
Photo - Claire Jarmain
The WRT members train after arriving back at Leeming Bar (05/07/2026)
Click here to see higher resolution photo

Ref - 17285
Photo - Claire Jarmain
The WRT members train after arriving back at Leeming Bar (05/07/2026)
Click here to see higher resolution photo

Ref - 17286
Photo - Dave Fielding
The Direct Works Team laid some new sleepers at Scruton to act as a base for a new container which will be arriving shortly. (30/06/2026)
Click here to see higher resolution photo

Ref - 17287
Photo - Dave Fielding
The Direct Works Team laid some new sleepers at Scruton to act as a base for a new container which will be arriving shortly. (30/06/2026)
Click here to see higher resolution photo

Ref - 17288
Photo - Dave Fielding
The Direct Works Team have re-erected the stop board at Scruton, which had been cute down to allow the ex Eskmeals signal box to be removed from the lineside and placed the paddock behind Scruton station (30/06/2026)
Click here to see higher resolution photo

Ref - 17289
Photo - Dave Fielding
The Direct Works Team have re-erected the stop board at Scruton, which had been cute down to allow the ex Eskmeals signal box to be removed from the lineside and placed the paddock behind Scruton station (30/06/2026)
Click here to see higher resolution photo

Ref - 17290
Photo - Dave Fielding
The Direct Works Team have replaced some timbers at bridge 12 (21/07/2026)
Click here to see higher resolution photo

Ref - 17291
Photo - Dave Fielding
The Direct Works Team have replaced some timbers at bridge 12 (21/07/2026)
Click here to see higher resolution photo

Ref - 17292
Photo - Graham Boyd
Members of the Direct Works Team pointing the stonework on the southern upstand of Stoop House Bridge (21/07/2026)
Click here to see higher resolution photo

Ref - 17293
Photo - Graham Boyd
Members of the Direct Works Team pointing the stonework on the southern upstand of Stoop House Bridge (21/07/2026)
Click here to see higher resolution photo

Ref - 17294
Photo - Graham Boyd
Members of the Direct Works Team mixing some cement for pointing the stonework on the southern upstand of Stoop House Bridge (21/07/2026)
Click here to see higher resolution photo

Ref - 17295
Photo - Graham Boyd
Members of the Direct Works Team pointing the stonework on the southern upstand of Stoop House Bridge (21/07/2026)
Click here to see higher resolution photo

Ref - 17296
Photo - Timothy Edwards
The LMS guards van's restoration is under way. (21/07/2026)
Click here to see higher resolution photo

Ref - 17297
Photo - Timothy Edwards
The LMS guards van's restoration is under way. The platform floor at this end has been removed (21/07/2026)
Click here to see higher resolution photo

Ref - 17298
Photo - Timothy Edwards
The LMS guards van's restoration is under way. Old rotten woodwork has been cut away at the other end - the platform floor has still to be removed (21/07/2026)
Click here to see higher resolution photo

Ref - 17299
Photo - Timothy Edwards
The LMS guards van's restoration is under way. The platform floor at this end has still to be removed. (21/07/2026)
Click here to see higher resolution photo

Ref - 17300
Photo - Timothy Edwards
The LMS guards van's restoration is under way. (28/07/2026)
Click here to see higher resolution photo

Ref - 17301
Photo - Timothy Edwards
The LMS guards van's restoration is under way.The platform floor at this end has been removed and more rotten stide woodwork has been removed (28/07/2026)
Click here to see higher resolution photo

Ref - 17302
Photo - Timothy Edwards
The LMS guards van's restoration is under way. The platform floor at the other end has now been removed (28/07/2026)
Click here to see higher resolution photo

Ref - 17303
Photo - Timothy Edwards
Restoration of the Mk2 coach W14073 continues - Here some new steelwork has been welded it to cover areas that had cut away due to rust. (21/07/2026)
Click here to see higher resolution photo

Ref - 17304
Photo - Timothy Edwards
Restoration of the Mk2 coach W14073 continues (21/07/2026)
Click here to see higher resolution photo

Ref - 17305
Photo - Timothy Edwards
Restoration of the Mk2 coach W14073 continues (28/07/2026)
Click here to see higher resolution photo

Ref - 17306
Photo - Timothy Edwards
Restoration of the Mk2 coach W14073 continues (28/07/2026)
Click here to see higher resolution photo

Ref - 17340
Photo - Timothy Edwards
A Alston point motor needing to be overhauled (21/07/2026)
Click here to see higher resolution photo

Ref - 17341
Photo - Timothy Edwards
A Alston point motor needing to be overhauled - got a lot of leaves in it from Eggborough (21/07/2026)
Click here to see higher resolution photo

Ref - 17342
Photo - Timothy Edwards
A Alston point motor needing to be overhauled - got a lot of leaves in it from Eggborough (21/07/2026)
Click here to see higher resolution photo

Ref - 17343
Photo - Timothy Edwards
Another Alston point motor. This has been overhauled (21/07/2026)
Click here to see higher resolution photo

Ref - 17344
Photo - Timothy Edwards
Another Alston point motor. This has been overhauled (21/07/2026)
Click here to see higher resolution photo

Ref - 17345
Photo - Timothy Edwards
Another Alston point motor. The base of this one is broken in to. The base will have to be welded back together and the point motor then rebuilt. All parts are thought to be there. (21/07/2026)
Click here to see higher resolution photo

Ref - 17346
Photo - Timothy Edwards
Another Alston point motor. The base of this one is broken in to. The base will have to be welded back together and the point motor then rebuilt. (21/07/2026)
Click here to see higher resolution photo

Ref - 17347
Photo - Timothy Edwards
Another Alston point motor. This has just been overhauled in the goods shed workshop (21/07/2026)
Click here to see higher resolution photo

Ref - 17348
Photo - Timothy Edwards
Another Alston point motor. This has just been overhauled in the goods shed workshop (21/07/2026)
Click here to see higher resolution photo

Ref - 17349
Photo - Timothy Edwards
The steps from the yard up to Leeming Bar platform are now finished complete with a new gate. (28/07/2026)
Click here to see higher resolution photo

Ref - 17350
Photo - Timothy Edwards
The steps from the yard up to Leeming Bar platform are now finished complete with a new gate. (28/07/2026)
Click here to see higher resolution photo

Ref - 17351
Photo - Timothy Edwards
Our newly repaired and painted Sentinel shunter doing a bit of shunting. (28/07/2026)
Click here to see higher resolution photo

Ref - 17307
Photo - Chris Morrill
The P-way Team replacing a couple of rotten timbers at a track joint in the Newton le Willows area. (06/07/2026)
Click here to see higher resolution photo

Ref - 17308
Photo - Chris Morrill
The P-way team replacing some rotten timbers near bridge 15 (06/07/2026)
Click here to see higher resolution photo

Ref - 17309
Photo - Chris Morrill
The P-way team replacing a couple of rotten sleepers near Ham Hall (12/07/2026)
Click here to see higher resolution photo

Ref - 17310
Photo - Chris Morrill
The P-way team replacing a couple of rotten sleepers near Ham Hall (12/07/2026)
Click here to see higher resolution photo

Ref - 17311
Photo - Micahel Metcalfe
The P-way team worked around Bridge 30 (just east of Wensley level crossing) removing some tree roots, retrieving logs and also collecting some old sections of rail for possible reuse. (13/07/2026)
Click here to see higher resolution photo

Ref - 17312
Photo - Chris Morrill
The P-way team replacing rotten sleepers at of Fox Park UWC (15/07/2026)
Click here to see higher resolution photo

Ref - 17313
Photo - Chris Morrill
The P-way team replacing rotten sleepers at of Fox Park UWC (15/07/2026)
Click here to see higher resolution photo

Ref - 17314
Photo - Peter Griffen
The P-way team at has put up some temporary metal fence panels to cordon off part of the car park at Redmire which is being used for storage purposes (27/08/2026)
Click here to see higher resolution photo

Ref - 17315
Photo - John Thompson
On the 1st July the vegetation team assembled at the site of the (now lost) Ainderby station and here they are getting ready to board a works train to take them to the Wiske viaduct near Yafforth. The latter location was unable to be reached or accessed by other means. (01/07/2026)
Click here to see higher resolution photo

Ref - 17316
Photo - John Thompson
A member of the veg team gives an aircraft style demonstation of the pacer train's safety features as the veg team head towards the Wiske viaduct. The viaduct, though high, doesn't reach 37,000 feet! (01/07/2026)
Click here to see higher resolution photo

Ref - 17317
Photo - John Thompson
"Hi-ho, hi-ho, it's off to work we go". It's a novel experience for the vegetation team to be going to work by train. (01/07/2026)
Click here to see higher resolution photo

Ref - 17318
Photo - John Thompson
This is the Wiske viaduct, where the Wiske flows through the central arch. It's near Yafforth at the Northallerton end and it needs some attention from the veg team. It's got trees growing on it, beside it, and in to it, and it needs sorting out. (01/07/2026)
Click here to see higher resolution photo

Ref - 17319
Photo - Alan Graham
A member of the veg team removes the remains of a stump from a tree which had been growing out of the top of the Wiske viaduct structure. (01/07/2026)
Click here to see higher resolution photo

Ref - 17320
Photo - Alan Graham
The veg team working on the top of the Wiske viaduct. (01/07/2026)
Click here to see higher resolution photo

Ref - 17321
Photo - Alan Graham
A chainsaw operative of the vegetation team deals with trees growing too closely to the viaduct structure whilst another chainsaw colleague observes closely from a safe distance. (01/07/2026)
Click here to see higher resolution photo

Ref - 17322
Photo - Alan Graham
An ingrowing tree root has lifted this coping stone weighing several tons from its seat on the stonework below. Whilst the veg team were able to sever the root and prevent its regrowth, stone-work repairs were beyond their capability. But at least it won't get any worse. (01/07/2026)
Click here to see higher resolution photo

Ref - 17323
Photo - Alan Graham
The veg team working on Wiske viaduct. The pole-saw is extremely useful for reaching tree limbs and branches at viaduct height which can be tackled from the bridge itself. The team's transport awaits, safely parked in the distance. (01/07/2026)
Click here to see higher resolution photo

Ref - 17324
Photo - John Thompson
A veg team operative surveys the stumps of trees which were removed due to growing too close to the Wiske viaduct structure. (01/07/2026)
Click here to see higher resolution photo

Ref - 17325
Photo - John Thompson
Disposing of logs from trees removed from the confines of the Wiske viaduct stonework. (01/07/2026)
Click here to see higher resolution photo

Ref - 17326
Photo - John Thompson
A final picture of the veg team at work on the Wiske viaduct, with a pole-saw operative cutting tree branches from the bridge top. This job is unfinished business pending provision of a further works train whereupon the team will continue from where they left off in July. (01/07/2026)
Click here to see higher resolution photo

Ref - 17327
Photo - John Thompson
During the middle of the month the veg team worked during heatwave weather on the usual summer jobs involving the removal of high grass and weeds etc at level crossings to improve safety and vision. This is a before picture of one such crossing near Aiskew. (08/07/2026)
Click here to see higher resolution photo

Ref - 17328
Photo - John Thompson
This is the same crossing, same view afterwards. The team have three Stilh two stroke brush cutters and one Honda four stroke machine. (08/07/2026)
Click here to see higher resolution photo

Ref - 17329
Photo - John Thompson
The veg team at work with their brush cutters (petrol strimmers) at another crossing near Bedale during hot heatwave weather. (15/07/2026)
Click here to see higher resolution photo

Ref - 17330
Photo - John Thompson
Also during July the veg team were called to an urgent job on the stretch from Bedale bypass bridge towards the Wiske bridge further west (the bridge with the temp 5mph limit). Tall vegetation required removal so that lineside access could be available to bridge engineers. (15/07/2026)
Click here to see higher resolution photo

Ref - 17331
Photo - Alan Graham
Looking west from the Bedale bypass bridge, this image shows the vegetation clearance undertaken by the veg team on a baking hot day. Some idea of the height of the undergrowth removed can be gained from the remaining greenery in the middle of the picture; it was tall. (15/07/2026)
Click here to see higher resolution photo

Ref - 17332
Photo - John Thompson.
"Taking a break". Working in exceptional hot weather takes its toll and regular breaks and hydration are essential. Three members of the vegetation team cool off in the shade during one such rest period. (15/07/2026)
Click here to see higher resolution photo

Ref - 17333
Photo - John Thompson.
It's amazing what you find bym the lineside. Including the remains of a mangled bicycle. The veg team are always game for a bit of tidying up and this bike was destined for its final journey to the metal skip. (15/07/2026)
Click here to see higher resolution photo

Ref - 17334
Photo - John Thompson
Another crossing cleared by the veg team to restore and improve sight lines / visibility. This one near Newton-Le-Willows. (15/07/2026)
Click here to see higher resolution photo

Ref - 17335
Photo - Steve Hall
End of the line for the vegetation team? It's not often we get to work at the far end and we couldn't resist a selfie. (29/07/2026)
Click here to see higher resolution photo

Ref - 17336
Photo - Alan Graham
A before picture showing Redmire railhead where the veg team were asked to tidy up the area in advance of the Army coming to do some track upgrading. (29/07/2026)
Click here to see higher resolution photo

Ref - 17337
Photo - Alan Graham
An afterwards image of the previous slide, showing where the veg team have gone to work. (29/07/2026)
Click here to see higher resolution photo

Ref - 17338
Photo - Alan Graham
This is the last bridge on our railway and it passes over Hargill Lane in Redmire. Most get to see the one before it which crosses the A684 on an S-bend at Redmire station. It's also a before picture as the veg team were just about to remove the ivy smothering the sides. (29/07/2026)
Click here to see higher resolution photo

Ref - 17339
Photo - Alan Graham
An afterwards image taken from the same standpoint as the previous slide. You may be able to make out the end of line buffers in the distance. (29/07/2026)