Leeming Bar Pit
by the Direct Works Team
In 2011 the Direct Works Team assisted in concreting the base of an inspection pit at Leeming Bar

Photo - John Tong
A large trench dug at Leeming bar ready to form an inspection pit (05/05/2011)
Click here to see higher resolution photo
Photo - John Tong
A large trench dug at Leeming bar ready to form an inspection pit (05/05/2011)
Click here to see higher resolution photo
Photo - John Tong
Getting ready to pour concrete to form the bottom of an inspection pit at Leeming Bar (05/05/2011)
Click here to see higher resolution photo
Photo - John Tong
Getting ready to pour concrete to form the bottom of an inspection pit at Leeming Bar (05/05/2011)
Click here to see higher resolution photo
Photo - John Tong
Starting to pour concrete to form the bottom of an inspection pit at Leeming Bar (05/05/2011)
Click here to see higher resolution photo
Photo - John Tong
Pouring concrete to form the bottom of an inspection pit at Leeming Bar (05/05/2011)
Click here to see higher resolution photo
Photo - John Tong
Levelling off the concrete to form the bottom of an inspection pit at Leeming Bar (05/05/2011)
Click here to see higher resolution photo