Wensleydale Railway - Photo Archive


Argill Farm Track Relaying - Welding, Tamping etc.
by the Infrastructure Group
In January 2018 the railway carried out a complete at Argill Farm. At 340 yards, this was the longest track renewal we have undertaken. The old track was thoroughly life-expired bullhead rail on softwood sleepers. It was replaced with flat bottom rail on concrete sleepers using Pandrol clips. The old track was taken to Leyburn for use in the passing loop there. Below you can see a comprehensive photographic record of the work.

Ref - 3304
Photo - Alastair Connell
Argill Farm track relay. Track being checked prior to being tamped (03/02/2018)
Click here to see higher resolution photo
Ref - 3304
Photo - Alastair Connell
Argill Farm track relay. Track being checked prior to being tamped (03/02/2018)
Click here to see higher resolution photo
Ref - 3305
Photo - Ian Yale
The infrastructure Team redistributing ballast prior to the line being tamped (03/02/2018)
Click here to see higher resolution photo
Ref - 3272
Photo - Ian Yale
The infrastructure Team redistributing ballast prior to the line being tamped at Argill (03/02/2018)
Click here to see higher resolution photo
Ref - 3306
Photo - Ian Yale
The infrastructure Team have lifted the UWC (User Worked Crossing) at Argill ready for tamper and with ballast redistributed (03/02/2018)
Click here to see higher resolution photo
Ref - 3273
Photo - Peter Harbord
A VolkerRail tamper at Bedale Station. Prior to it tamping the new track at Argill Farm, Bedale was being used as a base for them to do some training. (06/02/2018)
Click here to see higher resolution photo
Ref - 3310
Photo - Andy Glendinning
VolkerRail tamper DR75401 stabled at Bedale. Prior to it tamping the new track at Argill Farm, Bedale was being used as a base for them to do some training. (06/02/2018)
Click here to see higher resolution photo
Ref - 3307
Photo - Mike Brittlebank
Argill Farm relaying - Preheating for the transition welding at both ends of the renewal. (07/02/2018)
Click here to see higher resolution photo
Ref - 3308
Photo - Mike Brittlebank
Argill Farm relaying - Preheating for the transition welding at both ends of the renewal. (07/02/2018)
Click here to see higher resolution photo
Ref - 3309
Photo - Andy Glendinning
Argill Farm. Track welders at work. Note the threepenny bit appearance of the track at this time. (07/02/2018)
Click here to see higher resolution photo
Ref - 3311
Photo - Andy Glendinning
Argill Farm. The tamper has just completed its final pass. The temporarily removed User Worked Crossing is just to its left. (08/02/2018)
Click here to see higher resolution photo
Ref - 3274
Photo - Mike Brittlebank
Argill Farm track relaying - The Tamper doing its job (08/02/2018)
Click here to see higher resolution photo
Ref - 3313
Photo - Andy Glendinning
Argill Farm. After the tamper has worked its magic -- nice smooth curves. (08/02/2018)
Click here to see higher resolution photo
Ref - 3275
Photo - Mike Brittlebank
Argill Farm relaying - Shots of the track after it was tamped and ballasted. (08/02/2018)
Click here to see higher resolution photo
Ref - 3314
Photo - Mike Brittlebank
Argill Farm relaying - Shots of the track after it was tamped and ballasted. (08/02/2018)
Click here to see higher resolution photo
Ref - 3276
Photo - Mike Brittlebank
Argill Farm relaying - Shots of the track after it was tamped and ballasted. (08/02/2018)
Click here to see higher resolution photo
Ref - 3277
Photo - Mike Brittlebank
Argill Farm relaying - Shots of the track after it was tamped and ballasted. (08/02/2018)
Click here to see higher resolution photo
Ref - 3315
Photo - Mike Brittlebank
Argill Farm relaying - Shots of the track after it was tamped and ballasted. (08/02/2018)
Click here to see higher resolution photo
Ref - 3316
Photo - Andy Glendinning
Tamper DR75401 departs Leeming Bar to return to the main line. (09/02/2018)
Click here to see higher resolution photo
Ref - 3317
Photo - Andy Glendinning
Argill Farm UWC new double width deck installed, just tidying up. (17/02/2018)
Click here to see higher resolution photo
Ref - 3318
Photo - Andy Chapman
The western end of the Argill farm track relay after the tamping and the User Worked Crossing has been reinstated. There is a small dip here which needs rectifying (17/02/2018)
Click here to see higher resolution photo
Tip - You may find it better to view the pictures in 'full screen' mode - For most browsers F11 will toggle this on and off
date_default_timezone_set("Europe/London"); ?>© 2025 Wensleydale Railway