Wensleydale Railway - Photo Archive


Drainage work near Constable Burton
by the Infrastructure Group
This set of photos is of some Infrastructure work a small team carried out recently during a lull in trains from 6-9 July 2015. It was a 3 day job.
Basically this area near to the Constable Burton loop had became a duck pond, after severe rain resulted in overflows and cascades (water/silt) down the railway to a point where the last two photos are taken - the mass of silt here is vast and blocks a cross drain very easily.
After this work the main (90%) bulk of water goes down the new cross drain and the rest goes down the original restored cross drain leaving nothing to continue down the now cleared U tubes until water levels increase. What the pictures doesn't show is that there is at least another 80m of U tubes to clear out back to the next UWC.

Ref - 1277
Photo - Michael Metcalfe
Constable Burton Drainage work - Jim Wareing starting ditching work prior to getting to the U tubes (06/07/2015)
Click here to see higher resolution photo
Ref - 1277
Photo - Michael Metcalfe
Constable Burton Drainage work - Jim Wareing starting ditching work prior to getting to the U tubes (06/07/2015)
Click here to see higher resolution photo
Ref - 1278
Photo - Michael Metcalfe
Constable Burton Drainage work - Jim Wareing starting ditching work prior to getting to the U tubes (06/07/2015)
Click here to see higher resolution photo
Ref - 1279
Photo - Michael Metcalfe
Constable Burton Drainage work - Photo showing the outlet for a cross drain which was completely buried and shows it dug out to a field drain system (06/07/2015)
Click here to see higher resolution photo
Ref - 1280
Photo - Michael Metcalfe
Constable Burton Drainage work - Michael Metcalfe rodding the cross drain and the slime that was in there shows water was getting in at some point (06/07/2015)
Click here to see higher resolution photo
Ref - 1281
Photo - Michael Metcalfe
The digger digging out for a new cross drain opposite the main flood outlet from the duck pond (09/07/2015)
Click here to see higher resolution photo
Ref - 1282
Photo - Michael Metcalfe
Constable Burton Drainage work - The digger digging out for a new cross drain opposite the main flood outlet from the duck pond. The new pipe can also be seen (09/07/2015)
Click here to see higher resolution photo
Ref - 1283
Photo - Michael Metcalfe
Constable Burton Drainage work - The field drain which the new cross drain will run into. (09/07/2015)
Click here to see higher resolution photo
Ref - 1284
Photo - Michael Metcalfe
Constable Burton Drainage work - Photo showing the point at where the new cross drain will meet the flood. (09/07/2015)
Click here to see higher resolution photo
Ref - 1285
Photo - Michael Metcalfe
Constable Burton Drainage work - Photo showing the point at where the new cross drain will meet the flood. A mesh has now been fitted to prevent large ballast from entering. (09/07/2015)
Click here to see higher resolution photo
Ref - 1286
Photo - Michael Metcalfe
Constable Burton Drainage work - Andy Waite clearing the misaligned pipe from the U tube and after some repairs a result. (09/07/2015)
Click here to see higher resolution photo
Ref - 1287
Photo - Michael Metcalfe
Constable Burton Drainage work - showing the cross drain now running free. (09/07/2015)
Click here to see higher resolution photo
Ref - 1288
Photo - Michael Metcalfe
Constable Burton Drainage work - Carrying out some ditching work. (09/07/2015)
Click here to see higher resolution photo
Ref - 1289
Photo - Michael Metcalfe
Constable Burton Drainage work - Carrying out some ditching work. (09/07/2015)
Click here to see higher resolution photo
Tip - You may find it better to view the pictures in 'full screen' mode - For most browsers F11 will toggle this on and off
date_default_timezone_set("Europe/London"); ?>© 2025 Wensleydale Railway