Wensleydale Railway - Photo Archive
Drainage work near Constable Burton
by the Infrastructure Group
This set of photos is of some Infrastructure work a small team carried out recently during a lull in trains from 6-9 July 2015. It was a 3 day job.
Basically this area near to the Constable Burton loop had became a duck pond, after severe rain resulted in overflows and cascades (water/silt) down the railway to a point where the last two photos are taken - the mass of silt here is vast and blocks a cross drain very easily.
After this work the main (90%) bulk of water goes down the new cross drain and the rest goes down the original restored cross drain leaving nothing to continue down the now cleared U tubes until water levels increase. What the pictures doesn't show is that there is at least another 80m of U tubes to clear out back to the next UWC.
Click here to see higher resolution photo
Click here to see higher resolution photo
Click here to see higher resolution photo
Click here to see higher resolution photo
Click here to see higher resolution photo
Click here to see higher resolution photo
Click here to see higher resolution photo
Click here to see higher resolution photo
Click here to see higher resolution photo
Click here to see higher resolution photo
Click here to see higher resolution photo
Click here to see higher resolution photo
Click here to see higher resolution photo
Click here to see higher resolution photo
Tip - You may find it better to view the pictures in 'full screen' mode - For most browsers F11 will toggle this on and off
date_default_timezone_set("Europe/London"); ?>© 2024 Wensleydale Railway