Wensleydale Railway - Photo Archive


Northallerton Track Renewal
The story started back in January 2016, when I (Mike Brittlebank) was asked to inspect the track west of the run-round loop at Castle Hills. What Alastair Connell and myself found, was that the track had a 47mm twist, and had moved 50mm south. The cause of this defect was that the track bed had been undermined by rabbits. The eastern points also needed six new point timbers. As an interim measure we will fit three gauge ties. The run round loop had a 30mm drop at the points, all of these items resulted in a ban on all trains going to Northallerton West. Added to this was the state of the track west of Finghall station where a 5MPH speed limit had been imposed. For commercial reason it was imperative that the section west of Finghall was repaired first, as we had neither the money nor the manpower to fix both simultaneously. An audit showed that Castle Hills section required 600+ sleepers to be replaced. This equates to 30+ weeks of hard work, and which would not solve the twist problem. While this work is going on we would not be able to work elsewhere on the railway.
The solution that evolved was to replace all track from western end of the points at Castle Hills to Wiske Bridge, over a three year period with flat bottom rail and concrete sleepers. The initial stage would be from just before the start of the twist and replace the track in the worst section. This was the plan: replace 600 feet of track with flat bottom rail, the flat bottom rail coming from Bedale loop. Once the sleepers were removed, 100mm of ballast would be dug out, and pushed over the south side of the track, level the track bed, place the concrete sleepers in position, rubber pads, rails and clip up, ballast and tamp. The estimated cost for this year was 20K. The cost for next year will be 35K as we will need to buy in flat bottom rails. As well as that, all the trees had to be taken down, drainage has to be reinstated, and rabbits killed. The trees were taken down from the western points to the end of the first replacement track section. Gassing rabbits is going to be very dangerous, as during the evening hours the number of trespassers on the railway is very high. Best time for gassing rabbits is during the winter with shorter days - hope we will have no trespassers on the railway.
After this the ballast neeeds to be levelled off and finally the tamper to go over. The guys working this last week in June need a big thank you. The working conditions were terrible, every one got soaking wet. Some people took time off work to help out, using up their holidays. Well done every one.
A big thank you to every one who helped out, especially Ops, Vegetation team (who also helped with the track work), Infrastructure and Alastair Connell, without whose knowledge and know how this project could not have been done.
Mike Brittlebank - Infrastructure Manager
Photographs
The photos below were taken by Ian Yale, Steve Hall, Andy Waite and Mike Brittlebank

Ref - 1317
Photo - Mike Brittlebank
Northallerton West Track Replacement - A view From the Northallerton West loop points looking west before starting work (20/02/2016)
Click here to see higher resolution photo
Ref - 1317
Photo - Mike Brittlebank
Northallerton West Track Replacement - A view From the Northallerton West loop points looking west before starting work (20/02/2016)
Click here to see higher resolution photo
Ref - 1318
Photo - Mike Brittlebank
Northallerton West Track Replacement - Rabbit holes in track near Northallerton West (20/02/2016)
Click here to see higher resolution photo
Ref - 1319
Photo - Mike Brittlebank
Just passed the western points of the Northallerton West loop looking west (06/04/2016)
Click here to see higher resolution photo
Ref - 1320
Photo - Andy Waite
Northallerton West Track Replacement - Vegetation being cleared (09/04/2016)
Click here to see higher resolution photo
Ref - 1321
Photo - Andy Waite
Northallerton West Track Replacement - The yellow paint on the fishplates is start of section to be replaced, the yellow X is to denotes sleeper replacement (09/04/2016)
Click here to see higher resolution photo
Ref - 1322
Photo - Mike Brittlebank
Northallerton West Track Replacement - The emphasis had changed to clearing out the north side of the track, as this is where the concrete sleepers are to be stored. (20/04/2016)
Click here to see higher resolution photo
Ref - 1323
Photo - Andy Waite
Northallerton West Track Replacement - Coffee Time (23/04/2016)
Click here to see higher resolution photo
Ref - 1324
Photo - Mike Brittlebank
Northallerton West Track Replacement - A walk along the track for the whole section to be replaced, yellow fishplates to yellow fishplates, the north side is now clear of vegetation and is ready for the stacks of concrete sleepers (23/04/2016)
Click here to see higher resolution photo
Ref - 1325
Photo - Mike Brittlebank
Northallerton West Track Replacement - A walk along the track for the whole section to be replaced, yellow fishplates to yellow fishplates, the north side is now clear of vegetation and is ready for the stacks of concrete sleepers (23/04/2016)
Click here to see higher resolution photo
Ref - 1326
Photo - Mike Brittlebank
Northallerton West Track Replacement - Work clearing out the south side had to finish early due to snow! (27/04/2016)
Click here to see higher resolution photo
Ref - 1327
Photo - Mike Brittlebank
Northallerton West Track Replacement - View from the eastern end looking west showing how much vegetation has been cleared (12/05/2016)
Click here to see higher resolution photo
Ref - 1328
Photo - Mike Brittlebank
Northallerton West Track Replacement - Rolled the flat bottom rail out of Bedale loop, into the 6 foot ready to be taken to Northallerton West (18/05/2016)
Click here to see higher resolution photo
Ref - 1329
Photo - Mike Brittlebank
Northallerton West Track Replacement - Placing the sleepers in stacks ready for use (25/05/2016)
Click here to see higher resolution photo
Ref - 1330
Photo - Mike Brittlebank
Northallerton West Track Replacement - Piles of concrete sleepers placed ready for use (25/05/2016)
Click here to see higher resolution photo
Ref - 1331
Photo - Mike Brittlebank
Northallerton West Track Replacement - Picking up and placing the flat bottom rails from Bedale onto a truck (26/05/2016)
Click here to see higher resolution photo
Ref - 1332
Photo - Mike Brittlebank
Northallerton West Track Replacement - The rail lifting beam, has a hydraulic rotor, controlled by the operator, to align the beam up with the rail, it lifts the rail up by means of hydraulic clamps under the operators control. (26/05/2016)
Click here to see higher resolution photo
Ref - 1333
Photo - Mike Brittlebank
Northallerton West Track Replacement - the rails out at Northallerton West (26/05/2016)
Click here to see higher resolution photo
Ref - 1334
Photo - Mike Brittlebank
Putting the rails out at Northallerton West (26/05/2016)
Click here to see higher resolution photo
Ref - 1335
Photo - Steve Hall
Northallerton West Track Replacement - A view westwards at near Northallerton West showing the works train before track removal work commenced (11/06/2016)
Click here to see higher resolution photo
Ref - 1336
Photo - Steve Hall
Northallerton West Track Replacement - Some trainees from the Army Foundation College were helping to dismantle the track near Northallerton West (11/06/2016)
Click here to see higher resolution photo
Ref - 1337
Photo - Steve Hall
Northallerton West Track Replacement - Some trainees from the Army Foundation College were helping to dismantle the track near Northallerton West (11/06/2016)
Click here to see higher resolution photo
Ref - 1338
Photo - Steve Hall
Northallerton West Track Replacement - (11/06/2016)
Click here to see higher resolution photo
Ref - 1339
Photo - Steve Hall
Northallerton West Track Replacement - Some trainees from the Army Foundation College were helping to dismantle the track near Northallerton West (11/06/2016)
Click here to see higher resolution photo
Ref - 1340
Photo - Steve Hall
Northallerton West Track Replacement - Some trainees from the Army Foundation College were helping to dismantle the track near Northallerton West (11/06/2016)
Click here to see higher resolution photo
Ref - 1341
Photo - Andy Waite
Northallerton West Track Replacement - Some trainees from the Army Foundation College were helping to dismantle the track near Northallerton West (11/06/2016)
Click here to see higher resolution photo
Ref - 1342
Photo - Andy Waite
Northallerton West Track Replacement - The track bed has now been cleared in readiness to have the top layer of old ballast removed (11/06/2016)
Click here to see higher resolution photo
Ref - 1343
Photo - Andy Waite
Northallerton West Track Replacement - View the other way showing the cleared trackbed ready to have the top layer of old ballast removed (11/06/2016)
Click here to see higher resolution photo
Ref - 1344
Photo - Ian Yale
Northallerton West Track Replacement - The track bed is dropped by 100mm and levelled (27/06/2016)
Click here to see higher resolution photo
Ref - 1345
Photo - Andy Waite
Northallerton West Track Replacement - Sleepers laid out ready for the rails (28/06/2016)
Click here to see higher resolution photo
Ref - 1346
Photo - Andy Waite
Northallerton West Track Replacement - The rails have now been placed on the sleepers (28/06/2016)
Click here to see higher resolution photo
Ref - 1347
Photo - Andy Waite
Northallerton West Track Replacement - Work progressing on laying out sleepers (28/06/2016)
Click here to see higher resolution photo
Ref - 1348
Photo - Andy Waite
Northallerton West Track Replacement - Work progressing on laying out sleepers (28/06/2016)
Click here to see higher resolution photo
Ref - 1349
Photo - Steve Hall
Northallerton West Track Replacement - The new track has been laid and is being clipped and connected up (29/06/2016)
Click here to see higher resolution photo
Ref - 1350
Photo - Steve Hall
Northallerton West Track Replacement - The new track has been laid and is being clipped and connected up (29/06/2016)
Click here to see higher resolution photo
Ref - 1351
Photo - Steve Hall
Northallerton West Track Replacement - The new track has been laid and is being clipped and connected up (29/06/2016)
Click here to see higher resolution photo
Ref - 1352
Photo - Steve Hall
Northallerton West Track Replacement - The new track has been laid and is being clipped and connected up (29/06/2016)
Click here to see higher resolution photo
Ref - 1353
Photo - Steve Hall
Northallerton West Track Replacement - Some final checks of the new track before the ballast train arrives (30/06/2016)
Click here to see higher resolution photo
Ref - 1354
Photo - Steve Hall
Northallerton West Track Replacement - A view in the other direction of the newly laid track (30/06/2016)
Click here to see higher resolution photo
Ref - 1355
Photo - Ian Yale
Northallerton West Track Replacement - Some more final checks of the new track before the ballast train arrives (30/06/2016)
Click here to see higher resolution photo
Ref - 1356
Photo - Ian Yale
Northallerton West Track Replacement - The final rail joint connecting to the existing tack is still being worked on (30/06/2016)
Click here to see higher resolution photo
Ref - 1357
Photo - Ian Yale
Northallerton West Track Replacement - The ballasting train has now arrived at Northallerton West from the main line (30/06/2016)
Click here to see higher resolution photo
Ref - 1358
Photo - Ian Yale
Northallerton West Track Replacement - The new track bed ready for the ballasting train - Note that the track joint at the far end is still being worked on (30/06/2016)
Click here to see higher resolution photo
Ref - 1359
Photo - Ian Yale
Northallerton West Track Replacement - The ballasting train reversing towards the new track (30/06/2016)
Click here to see higher resolution photo
Ref - 1360
Photo - Ian Yale
Northallerton West Track Replacement - The ballasting train starting to go over the new section of track (30/06/2016)
Click here to see higher resolution photo
Ref - 1361
Photo - Ian Yale
Northallerton West Track Replacement - Ballast is being poured into the centre of the track (30/06/2016)
Click here to see higher resolution photo
Ref - 1362
Photo - Ian Yale
Northallerton West Track Replacement - Ballasting the new section of track (30/06/2016)
Click here to see higher resolution photo
Ref - 1363
Photo - Ian Yale
Northallerton West Track Replacement - This is as far as the ballast train hauled by 66519 went on its first run as the track joint at the far end was not yet complete (30/06/2016)
Click here to see higher resolution photo
Ref - 1364
Photo - Ian Yale
Northallerton West Track Replacement - View showing the ballast that has been laid - Note the work still going on in the distance at the track joint (30/06/2016)
Click here to see higher resolution photo
Ref - 1365
Photo - Ian Yale
Northallerton West Track Replacement - The final bit of work on the track joint (30/06/2016)
Click here to see higher resolution photo
Ref - 1366
Photo - Ian Yale
Northallerton West Track Replacement - Now that the track joint is complete, the ballast train can come back and complete putting ballast down in the centre of the track (30/06/2016)
Click here to see higher resolution photo
Ref - 1367
Photo - Ian Yale
Northallerton West Track Replacement - Ballasting down the centre of the track continues (30/06/2016)
Click here to see higher resolution photo
Ref - 1368
Photo - Ian Yale
Northallerton West Track Replacement - Ballasting down the centre of the track continues (30/06/2016)
Click here to see higher resolution photo
Ref - 1369
Photo - Ian Yale
Northallerton West Track Replacement - The first ballasting run putting ballast down the centre of the track is complete - Loco 66519 (30/06/2016)
Click here to see higher resolution photo
Ref - 1370
Photo - Ian Yale
Northallerton West Track Replacement - View showing the new ballast down the centre of the track (30/06/2016)
Click here to see higher resolution photo
Ref - 1371
Photo - Ian Yale
Northallerton West Track Replacement - The ballast train now moves forward depositing ballast down the sides of the track (30/06/2016)
Click here to see higher resolution photo
Ref - 1372
Photo - Ian Yale
Northallerton West Track Replacement - The ballast train now moves forward depositing ballast down the sides of the track (30/06/2016)
Click here to see higher resolution photo
Ref - 1373
Photo - Ian Yale
Northallerton West Track Replacement - The trackbed and sleepers are now well covered in ballast (30/06/2016)
Click here to see higher resolution photo
Ref - 1374
Photo - Ian Yale
Northallerton West Track Replacement - The ballast train hauled by 66519 reverses back ready to do a final ballasting run (30/06/2016)
Click here to see higher resolution photo
Ref - 1375
Photo - Ian Yale
Northallerton West Track Replacement - The ballast train hauled by 66519 reverses back ready to do a final ballasting run (30/06/2016)
Click here to see higher resolution photo
Ref - 1376
Photo - Ian Yale
Northallerton West Track Replacement - The final ballasting run - Loco 66519 (30/06/2016)
Click here to see higher resolution photo
Ref - 1377
Photo - Ian Yale
Northallerton West Track Replacement - The final ballasting run (30/06/2016)
Click here to see higher resolution photo
Ref - 1378
Photo - Ian Yale
Northallerton West Track Replacement - The final ballasting run - The new ballast has been laid very neatly - Just awaiting a visit from the tamper (30/06/2016)
Click here to see higher resolution photo
Ref - 1379
Photo - Andy Waite
Northallerton West Track Replacement - Putting some fresh ballast on the existing track at the Northallerton West loop (30/06/2016)
Click here to see higher resolution photo
Ref - 1380
Photo - Andy Waite
Northallerton West Track Replacement - View from the Northallerton West loop of the work area showing the fresh ballast on the existing track (30/06/2016)
Click here to see higher resolution photo
Ref - 1381
Photo - Andy Waite
Northallerton West Track Replacement - Some fresh ballast also on the passing loop at Northallerton West (30/06/2016)
Click here to see higher resolution photo
Tip - You may find it better to view the pictures in 'full screen' mode - For most browsers F11 will toggle this on and off
date_default_timezone_set("Europe/London"); ?>© 2025 Wensleydale Railway