Here are photos to show the progress of the installation of the Leyburn Loop west points during November 2018 and the tamping of the loop in January 2019.

Ref - 4128
Photo - Andy Glendinning
Leyburn West Points installation Day 1. A 'before' picture I normally forget to take. Looking west. (05/11/2018)
Click here to see higher resolution photo
Ref - 4128
Photo - Andy Glendinning
Leyburn West Points installation Day 1. A 'before' picture I normally forget to take. Looking west. (05/11/2018)
Click here to see higher resolution photo
Ref - 4074
Photo - Michael Metcalfe
The start of the first day on Leyburn West points installation. (05/11/2018)
Click here to see higher resolution photo
Ref - 4077
Photo - Andy Glendinning
Leyburn West Points installation Day 1. Almost 'before' looking east. The old rails removed and dropped in the four foot. (05/11/2018)
Click here to see higher resolution photo
Ref - 4075
Photo - Michael Metcalfe
Leyburn West points installation Day 1 - Removing rails and chairs which were rusted together due to years of damp conditions under Bridge 25. (05/11/2018)
Click here to see higher resolution photo
Ref - 4076
Photo - Michael Metcalfe
Leyburn West points installation Day 1 - 03/144 with the works train in position. The far Sea Urchin is been used for the old spoil and the middle one has the good ballast in, the other one came for the ride. (05/11/2018)
Click here to see higher resolution photo
Ref - 4129
Photo - Michael Metcalfe
Leyburn West points installation Day 1 - Digging out starts, all the spoil will be placed behind the digger by the dumper for loading into the Sea Urchin rail wagon later. (05/11/2018)
Click here to see higher resolution photo
Ref - 4078
Photo - Andy Glendinning
Leyburn West Points installation Day 1. Existing sleepers removed and used to form a pad to contain the dug out spoil. (05/11/2018)
Click here to see higher resolution photo
Ref - 4130
Photo - Michael Metcalfe
Leyburn West points installation Day 1 - Digging out continues with some additional lighting under the bridge. (05/11/2018)
Click here to see higher resolution photo
Ref - 4087
Photo - Andy Glendinning
Leyburn West Points installation Day 2. The 03 shunter gives a good impression of a steam loco as it starts up. (06/11/2018)
Click here to see higher resolution photo
Ref - 4084
Photo - Andy Glendinning
Leyburn West Points installation Day 2. Work continues digging out the old spoil from under the bridge. (06/11/2018)
Click here to see higher resolution photo
Ref - 4085
Photo - Andy Glendinning
Leyburn West Points installation Day 2. It'll be quicker with the digger, Michael. (06/11/2018)
Click here to see higher resolution photo
Ref - 4086
Photo - Andy Glendinning
Leyburn West Points installation Day 2. Quite a pile of spoil to remove. (06/11/2018)
Click here to see higher resolution photo
Ref - 4131
Photo - Michael Metcalfe
Leyburn West points installation Day 2 - Moving the spoil heap into the Sea Urchin. (06/11/2018)
Click here to see higher resolution photo
Ref - 4088
Photo - Andy Glendinning
Leyburn West Points installation Day 2. Another wagon to load. (06/11/2018)
Click here to see higher resolution photo
Ref - 4081
Photo - Kev Burnitt
Leyburn West points installation Day 2 - The infrastructure hard at work completing the Leyburn loop (06/11/2018)
Click here to see higher resolution photo
Ref - 4132
Photo - Kev Burnitt
Leyburn West points installation Day 2 - The infrastructure hard at work completing the Leyburn loop (06/11/2018)
Click here to see higher resolution photo
Ref - 4082
Photo - Kev Burnitt
Leyburn West points installation Day 2 - The infrastructure hard at work completing the Leyburn loop (06/11/2018)
Click here to see higher resolution photo
Ref - 4083
Photo - Kev Burnitt
Leyburn West points installation day 2 - the infrastructure hard at work completing the Leyburn loop (06/11/2018)
Click here to see higher resolution photo
Ref - 4079
Photo - Michael Metcalfe
Leyburn West points installation Day 2 - A membrane is placed on the floor and ballast is been tipped onto it and spread by hand mostly. The Sea Urchin had been swapped round with good ballast in. (06/11/2018)
Click here to see higher resolution photo
Ref - 4133
Photo - Michael Metcalfe
Leyburn West points installation Day 2 - View of the ballast bed. (06/11/2018)
Click here to see higher resolution photo
Ref - 4080
Photo - Michael Metcalfe
Leyburn West points installation Day 2 - The digger been loaded back onto the Flatrol as it's use is over now. (06/11/2018)
Click here to see higher resolution photo
Ref - 4089
Photo - Andy Glendinning
Leyburn West Points installation Day 4. No work on the points but a small team tidied up around the station site. You've got to have a clean trolley ... (10/11/2018)
Click here to see higher resolution photo
Ref - 4090
Photo - Andy Glendinning
Leyburn West Points installation Day 4. If you're going to use it as your lunchtime seat. (10/11/2018)
Click here to see higher resolution photo
Ref - 4096
Photo - Andy Glendinning
Leyburn West Points installation Day 6. All the crossing timbers laid out and a start made on moving the switches and crossing into place. (14/11/2018)
Click here to see higher resolution photo
Ref - 4091
Photo - Michael Metcalfe
Leyburn West points installation Day 6 - The crossing timbers now laid out with the crossing unit in place and a 60' length of rail which will be used for the datum line where all other measurements will be taken from once fastened down. (14/11/2018)
Click here to see higher resolution photo
Ref - 4134
Photo - Michael Metcalfe
Leyburn West points installation Day 6 - Both switches on the timbers and about to line up the 60' rail. There were up to 51 ish hardwood timbers for this installation. (14/11/2018)
Click here to see higher resolution photo
Ref - 4135
Photo - John Tong
Leyburn West points installation Day 6 - Preparing to move a rail (14/11/2018)
Click here to see higher resolution photo
Ref - 4092
Photo - Michael Metcalfe
Leyburn West points installation Day 6 - Lifting the rail to enable the base plates to be fitted underneath. (14/11/2018)
Click here to see higher resolution photo
Ref - 4093
Photo - John Tong
Leyburn West points installation Day 6 - Baring a rail over (14/11/2018)
Click here to see higher resolution photo
Ref - 4094
Photo - John Tong
Leyburn West points installation Day 6 - Jacking up the rail (14/11/2018)
Click here to see higher resolution photo
Ref - 4095
Photo - John Tong
Leyburn West points installation Day 6 - Is it correctly placed (14/11/2018)
Click here to see higher resolution photo
Ref - 4097
Photo - Andy Glendinning
Leyburn West Points installation Day 7. Careful work needed to ensure that the various components are correctly positioned according to the drawing and plan. The end of a very misty day. (16/11/2018)
Click here to see higher resolution photo
Ref - 4098
Photo - Andy Glendinning
Leyburn West Points installation Day 8. After a day of much jacking,heaving and cussing the existing south platform road was slewed to line up with the new points. (17/11/2018)
Click here to see higher resolution photo
Ref - 4136
Photo - Michael Metcalfe
Leyburn West points installation Day 10 - Sparks flying while cutting the switch rail ends to length. (22/11/2018)
Click here to see higher resolution photo
Ref - 4137
Photo - Michael Metcalfe
Leyburn West points installation Day 10 - End of play with closure rails connected to the crossing unit,it's dark outside. (22/11/2018)
Click here to see higher resolution photo
Ref - 4099
Photo - Michael Metcalfe
Leyburn West points installation Day 12 - Moving the digger into the 4'is not the easiest of jobs. (26/11/2018)
Click here to see higher resolution photo
Ref - 4100
Photo - Michael Metcalfe
Leyburn West points installation Day 12 - The digger been used to slew the loop line towards the main line. (26/11/2018)
Click here to see higher resolution photo
Ref - 4101
Photo - Kev Burnitt
Leyburn West points installation Day 12 - Despite the poor weather, work carries on at the Leyburn loop (26/11/2018)
Click here to see higher resolution photo
Ref - 4102
Photo - Kev Burnitt
Leyburn West points installation Day 12 - Despite the poor weather, work carries on at the Leyburn loop (26/11/2018)
Click here to see higher resolution photo
Ref - 4103
Photo - Andy Glendinning
Leyburn West Points installation Day 12. The sleepers which had formed the pad had been dug out. (26/11/2018)
Click here to see higher resolution photo
Ref - 4104
Photo - Andy Glendinning
Leyburn West Points installation Day 12. Duff sleepers loaded to the trolley for disposal.While I had been away in the foreground the 60' panel of flat bottom rail had been laid connecting the points to the existing platform line. (26/11/2018)
Click here to see higher resolution photo
Ref - 4105
Photo - Michael Metcalfe
Leyburn West points installation Day 13 - 2 Bullhead rails needed moving down the site on rollers and this rail (needs to go just the other side of the bridge) been the furthest away. Once the team know what to do and when it's quite an easy job. (28/11/2018)
Click here to see higher resolution photo
Ref - 4106
Photo - Michael Metcalfe
Leyburn West points installation Day 13 - Many trolley loads of spare or scrap materials need moving from the bridge area to a more accessible site. (28/11/2018)
Click here to see higher resolution photo
Ref - 4107
Photo - Andy Glendinning
Leyburn West Points installation Day 13. Lunchtime in the almost dry. Raining outside with water drops coming through the bridge deck above in places. (28/11/2018)
Click here to see higher resolution photo
Ref - 4108
Photo - Andy Glendinning
Leyburn West Points installation Day 13. Wet outside. Sleepers laid out, rail in place and being cut to fit. The chairs still need screwing to the sleepers. (28/11/2018)
Click here to see higher resolution photo
Ref - 4138
Photo - Andy Glendinning
Leyburn West Points installation Day 13. Looking like a set of points,the stretcher bars still need fitting. The last closure rail for the north line being cut. (28/11/2018)
Click here to see higher resolution photo
Ref - 4139
Photo - Michael Metcalfe
Leyburn West points installation Day 13 - Todays team plus the photographer of course. (28/11/2018)
Click here to see higher resolution photo
Ref - 4109
Photo - Andy Glendinning
Leyburn West Points installation Day 13. End of the day.Part of the large team of volunteers who have turned out in all weathers to help install the points. (28/11/2018)
Click here to see higher resolution photo
Ref - 4110
Photo - Andy Glendinning
Leyburn West Points installation Day 14. North rails screwed down and slewed into position.Ballast dropped through the points. (30/11/2018)
Click here to see higher resolution photo
Ref - 4140
Photo - Andy Glendinning
Leyburn West Points installation Day 14. Stretcher bars in place. Some hand packing of the ballast and the line will be ready for low speed movements. (30/11/2018)
Click here to see higher resolution photo
Ref - 4218
Photo - Andy Glendinning
First down passenger train approaching the new Leyburn West points. (26/12/2018)
Click here to see higher resolution photo
Ref - 4219
Photo - Andy Glendinning
First down passenger train about to cross the new Leyburn West points. (26/12/2018)
Click here to see higher resolution photo
Ref - 4221
Photo - Andy Glendinning
First up passenger train about to cross the new Leyburn West points. (26/12/2018)
Click here to see higher resolution photo
Ref - 4514
Photo - Andy Waite
The tamper arriving at Leyburn (16/01/2019)
Click here to see higher resolution photo
Ref - 4515
Photo - Andy Waite
A view of the Leyburn loop after a run by the tamper (16/01/2019)
Click here to see higher resolution photo
Ref - 4494
Photo - Andy Waite
Looking towards the loop from the west points located under the road bridge (16/01/2019)
Click here to see higher resolution photo
Ref - 4497
Photo - Andy Glendinning
DR75401 prepares to start tamping the new loop at Leyburn. (17/01/2019)
Click here to see higher resolution photo
Ref - 4517
Photo - Andy Waite
A view from the tamper operators conntrol position (17/01/2019)
Click here to see higher resolution photo
Ref - 4495
Photo - Andy Waite
A close up of the tampers tamping arms (17/01/2019)
Click here to see higher resolution photo
Ref - 4496
Photo - Andy Waite
The tamper in operation in the Leyburn loop. (17/01/2019)
Click here to see higher resolution photo
Ref - 4518
Photo - Andy Glendinning
Lined and levelled DR75401 uses its ballast brush to tidy up the rack. (17/01/2019)
Click here to see higher resolution photo
Tip - You may find it better to view the pictures in 'full screen' mode - For most browsers F11 will toggle this on and off
date_default_timezone_set("Europe/London"); ?>© 2025 Wensleydale Railway