Scruton Level Crossing Gateposts and Gates

by the Direct Works Team

New level crossing gates are to be installed at Scruton level crossing. On February 9th 2015 the posts to support the new gates were installed. Below, there is a photographic record of that job.

In March the new gates were being manufactured. Some photos of that work are shown below. See the next page for the gate installation